FIELD: oil and gas production; designed for selective control of passage of flow of formation fluid from producing formation through oil and/or gas well to day surface. SUBSTANCE: supplied from surface to one of ends of device body located in well is fluid. Supplied fluid interacts with piston in device body to produce difference of forces and upon attainment of its definite value, body other end is operated. Formation fluid flows through device body, pipe string to surface. Circular gap is formed and packer is installed in it. Preset pressure in formation is maintained. Difference of forces acting on piston is varied. EFFECT: increased reliability of selective control of formation fluid flow in pipe string. 7 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR EXTRACTING PIPE SECTIONS | 2023 |
|
RU2812003C1 |
DEVICE FOR CREATION OF GRAVEL WELL SCREEN IN PROCESS OF HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION | 2023 |
|
RU2821937C1 |
DEVICE FOR RESTORATION OF PRODUCTIVITY OF PRODUCING WELLS AND INJECTIVITY OF INJECTION WELLS | 2000 |
|
RU2184837C1 |
DOWNHOLE PULSATOR | 2012 |
|
RU2539087C2 |
CROSSOVER VALVE SYSTEM AND METHOD FOR GAS PRODUCTION | 2014 |
|
RU2671370C2 |
SLOT PERFORATOR | 2013 |
|
RU2533514C1 |
DEVICE FOR STOPPING FLUID FLOW IN THE WELL | 2003 |
|
RU2237152C1 |
DRILLING WITH PRESSURE OPTIMISATION BY CONTINUOUS DRILLING STRING OF LIFTING PIPES | 2011 |
|
RU2565299C2 |
DEVICE FOR SELECTIVE IMPLOSIVE PROCESSING OF PRODUCTIVE BED | 2013 |
|
RU2529063C1 |
METHOD OF OIL AND GAS INFLUX DEVELOPMENT AND INTENSIFICATION, WATERPROOFING PROCEDURE AND RELATED DEVICE FOR IMPLEMENTATION THEREOF | 2006 |
|
RU2345214C2 |
Authors
Dates
2002-06-20—Published
1998-09-01—Filed