FIELD: oil and gas industry.
SUBSTANCE: invention refers to oil and gas industry and can be used for well development, oil and gas influx intensification and waterproofing. Method of oil and gas influx development and intensification, well waterproofing procedure involves trip in hole of packer device body to shooting depth thus using external producing strings. Thereafter parker is installed and pressure tested for air-tightness. Central tubing row is racked and pressed. Working fluid is supplied with formation fluid pumping-out, while mixed fluid is supplied from well to surface through annular space. Annular space is fitted with external and central tubing rows. The device contains the body with pressure valve arranged between external radial channel and the channel connecting coaxial channels of jet pump nozzles and return valves. The body accommodates flushing pass hole, gallery and radial external and internal channels for fluid receiving and removal, jet pumps with diffuser. Each jet pump is in addition supplied with upper return valve arranged in longitudinal channel over diffuser. To activate jet pumps of the device, working fluid is supplied through pressure valve through annular space formed between flow string and external tubing row.
EFFECT: higher reliability of the device and reduction of well development time.
3 cl, 9 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ACCEPTANCE AND EXAMINATION OF WELLS, OF INTENSIFICATION OF OIL AND GAS INFLOWS, OF CONDUCTING WATER- INSULATION WORK AND GEAR FOR IMPLEMENTATION OF PROCESS | 2001 |
|
RU2179631C1 |
METHOD OF WELL COMPLETION, RESEARCH AND STIMULATION OF OIL-GAS INFLOWS AND DEVICE FOR ITS EMBODIMENT | 1998 |
|
RU2131023C1 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
JET-TYPE HYDRAULIC MANIPULATOR | 1996 |
|
RU2105146C1 |
DEVICE FOR INDUCING INFLOW OF FORMATION FLUID | 1991 |
|
RU2015317C1 |
DEVICE FOR FORMATION FLUID TRIGGERING OFF AND WELL TREATMENT | 2016 |
|
RU2640226C1 |
METHOD AND DEVICE FOR FLUSHING WELL, TREATING FORMATION AND COMPLETING A WELL IN ONE TRIPPING OPERATION | 2022 |
|
RU2814516C1 |
METHOD FOR TREATMENT OF BOTTOMHOLE ZONE AND DEVELOPMENT OF WELLS AND JET INSTALLATION FOR IMPLEMENTATION THEREOF | 2021 |
|
RU2822423C2 |
TREATMENT METHOD OF BOTTOM-HOLE FORMATION ZONE, AND DOWNHOLE SYSTEM FOR ITS IMPLEMENTATION | 2011 |
|
RU2485299C1 |
PROCESS TO RUN IN, TO EXAMINE WELLS AND TO INTENSIFY OIL AND GAS INFLUXES AND GEAR TO REALIZE IT | 1999 |
|
RU2160364C1 |
Authors
Dates
2009-01-27—Published
2006-12-26—Filed