FIELD: mining industry. SUBSTANCE: proposed compressor station is designed for use at completion of wells for delivering nitrogen-based explosion and fire hazard mixtures at high pressure. Station has piston air compressor of multistage design. Outlet of second stage of air compressor, through cooler and water-and-oil separator, is connected with inlet of diaphragm gas separating device through filter gang. Outlet of gas separating device is connected with inlet of third compression stage of air compressor. EFFECT: improved reliability at low ambient air temperatures, reduced overall dimensions of station. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OBTAINING AND COMPRESSION OF NITROGEN-AIR MIXTURE AND DEVICE FOR ITS REALIZATION | 2003 |
|
RU2252378C1 |
METHOD AND DEVICE FOR INERT NITROGEN-BASED GAS MIXTURE OBTAINING | 2003 |
|
RU2229070C1 |
MOBILE NITROGEN COMPRESSOR STATION AND METHOD OF PRODUCTION OF NITROGEN-BASED INERT GAS MIXTURE | 2004 |
|
RU2261403C1 |
NITROGEN COMPRESSOR PLANT TO INCREASE BED PRODUCTION RATE (VERSIONS) | 2012 |
|
RU2549654C2 |
NITROGEN COMPRESSOR STATION (EMBODIMENTS) | 2017 |
|
RU2659264C1 |
METHOD OF MEMBRANE GAS SEPARATION AND PLANT FOR ITS IMPLEMENTATION | 2016 |
|
RU2645140C1 |
METHOD FOR PRODUCTION OF INERT GAS MIXTURE BASED ON NITROGEN | 2001 |
|
RU2209382C2 |
NITROGEN COMPRESSOR STATION | 2013 |
|
RU2539409C1 |
INERT FOAM FIRE-FIGHTING STATION | 2012 |
|
RU2499624C2 |
METHOD FOR EXPLOSION SAFE CLEANSING OF PIPELINES WITH HYDROCARBON TRACES AND DEVICE FOR ITS IMPLEMENTATION | 2013 |
|
RU2533728C2 |
Authors
Dates
2002-08-20—Published
2001-04-09—Filed