METHOD OF OIL FIELD DEVELOPMENT Russian patent published in 2002 - IPC

Abstract RU 2189438 C1

FIELD: oil producing industry, particularly, methods of development of oil deposits with nonuniform, fissured, porous or mixed types of reservoirs. SUBSTANCE: method includes maintenance of flexible operating conditions of formations by use of periodic regimes of operation of producing well groups. Formed additionally from drilled wells are cells of producing wells with injection wells in center. Determined preliminarily at steady-state operation of producing wells, is water cutting of well production and average current water cutting of production of wells of each cell is calculated and taken as a basic one. Then curves of restoration of efficiency of producing well bottom holes are constructed. Direction of increased jointing or fluid filtration is determined by results of interpretation of said curves and dynamics of well water encroachment in previous period of operation. Producing wells of each cell located perpendicular from direction of increased jointing or fluid filtration are divided into two groups from injection axis running through injection well along direction of increased jointing of fluid filtration. Belonging to the first group of producing wells are wells whose average current water cutting of their production is below the basic one. The second group includes wells whose average current water cutting of their products is higher than the basic one. Operation of producing and injection wells is carried out by cycles. Each cycle includes first injection of fringe of visco-elastic composition through injection wells in direction of increased jointing or fluid filtration. Then fringe of displacing agent is injected. Operation of the second group of producing wells is discontinued, and operation of the first group of producing wells is continued until their average current production water cutting reaches that of basic one. After that, operation of the first group of producing wells is discontinued and operation of the second group of producing wells is renewed and continued until their reduced average current production water cutting rises to that of basic one. Cycles of periodic operation of producing wells of the first and second groups are repeated with operation of well groups in antiphase, both inside cells and between then up to reaching the economic criteria corresponding for finishing their operation. EFFECT: higher efficiency of method with increased oil recovery factor due to consideration of nonuniformity of formation reservoir properties in different directions. 4 cl, 1 dwg, 4 tbl, 1 ex

Similar patents RU2189438C1

Title Year Author Number
METHOD OF OIL POOL DEVELOPMENT 2001
  • Nurmukhametov R.S.
  • Khisamutdinov N.I.
  • Vladimirov I.V.
  • Taziev M.Z.
  • Zakirov A.F.
  • Gil'Manova R.Kh.
  • Butorin O.I.
  • Junusov Sh.M.
RU2191255C1
PROCESS OF DEVELOPMENT OF OIL FIELD 2000
  • Ibragimov N.G.
  • Taziev M.Z.
  • Zakirov A.F.
  • Khaliullin F.F.
  • Butorin O.I.
  • Vladimirov I.V.
  • Khisamutdinov N.I.
RU2184216C1
METHOD OF OIL POOL DEVELOPMENT 1999
  • Taziev M.Z.
  • Zherebtsov Ju.E.
  • Zherebtsov V.E.
  • Nurmukhametov R.S.
  • Salikhov I.M.
  • Butorin O.I.
  • Vladimirov I.V.
  • Khisamutdinov N.I.
RU2162141C1
PROCESS OF DEVELOPMENT OF LITHOLOGICALLY SCREENED OIL- SATURATED LENSES BY TWO WELLS 2001
  • Butorin O.O.
  • Khisamutdinov N.I.
  • Khaliullin F.F.
  • Zakirov A.F.
RU2203404C2
METHOD OF OIL POOL DEVELOPMENT 2000
  • Khisamutdinov N.I.
  • Taziev M.Z.
  • Telin A.G.
  • Mukminov F.Kh.
  • Khabibullin I.T.
  • Zherebtsov E.P.
  • Jakovlev S.A.
  • Fedotov G.A.
  • Avramenko A.N.
RU2187631C2
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS 2007
  • Andreev Dmitrij Vladimirovich
  • Abdulmazitov Rafil' Ginijatullovich
  • Ramazanov Rashit Gaznavievich
  • Muzalevskaja Nadezhda Vasil'Evna
RU2351752C1
METHOD OF DEVELOPMENT OF OIL POOL IN CARBONATE RESERVOIRS OF FRACTURED-POROUS TYPE 2000
  • Jusupov I.G.
  • Abdulmazitov R.G.
  • Khisamov R.S.
  • Kandaurova G.F.
  • Nasybullin A.V.
RU2204703C2
METHOD FOR OIL PRODUCTION AT THE LATER STAGE OF OIL DEPOSIT HAVING WATER BED DEVELOPMENT 2005
  • Khisamutdinov Nail' Ismagzamovich
  • Vladimirov Igor' Vjacheslavovich
  • Taziev Marat Mirgazijanovich
  • Sagitov Damir Kambirovich
  • Alekseev Denis Leonidovich
  • Butorin Oleg Ivanovich
RU2299977C2
METHOD OF DEVELOPING OIL DEPOSIT IN CARBONATE RESERVOIRS OF FISSURED TYPE 1996
  • Abdulmazitov R.G.
  • Minnullin R.M.
  • Sulejmanov Eh.I.
RU2101474C1
OIL DEPOSIT DEVELOPMENT METHOD 2004
  • Vafin Rif Vakilovich
  • Zaripov Mustafa Salikhovich
  • Gimaev Irek Mudarisovich
  • Sagitov Damir Kambirovich
  • Butorin Oleg Ivanovich
  • Vladimirov Igor' Vjacheslavovich
  • Alekseev Denis Leonidovich
  • Pijakov Gennadij Nikolaevich
RU2299979C2

RU 2 189 438 C1

Authors

Nurmukhametov R.S.

Khisamutdinov N.I.

Vladimirov I.V.

Taziev M.Z.

Akhmetov N.Z.

Gil'Manova R.Kh.

Butorin O.I.

Khaliullin F.F.

Dates

2002-09-20Published

2001-02-05Filed