FIELD: construction engineering; repair of pipe lines. SUBSTANCE: pipe line is unearthed and defective section is removed; then, new section is made from metal pipe with sealing rings laid in grooves, ends of pipe line is calibrated for outer diameter of repair section and its ends are introduced into pipe line, after which repair section is secured to pipe line. EFFECT: facilitated procedure of repair work. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIRING FIBERGLASS PIPELINE | 2005 |
|
RU2287733C1 |
METHOD FOR REPAIRING FIBERGLASS PIPES AND A REPAIR KIT FOR ITS IMPLEMENTATION | 2022 |
|
RU2781323C1 |
PLASTIC PIPE LINE | 2001 |
|
RU2211989C2 |
PIPELINE MANUFACTURING METHOD | 2001 |
|
RU2213897C2 |
METHOD OF PIPE MANUFACTURE | 2001 |
|
RU2191313C1 |
METHOD OF MANUFACTURE OF PIPE | 2001 |
|
RU2190531C1 |
PIPELINE | 2001 |
|
RU2191315C1 |
METHOD FOR REPAIRING FIBERGLASS PIPES | 2022 |
|
RU2789821C1 |
METHOD OF REPAIRING FIBERGLASS PIPELINE USING ADAPTER | 2019 |
|
RU2731079C1 |
ELBOW MAKING METHOD (VERSIONS) | 2001 |
|
RU2197675C2 |
Authors
Dates
2002-11-27—Published
2001-06-22—Filed