FIELD: oil and gas producing industry, particularly, devices for treatment and completion of wells in the course of their construction and operation. SUBSTANCE: device consists of pulse generator in the form of check valve conjugated with movable seat, circulation check valve and mechanical-hydraulic packer. Each of them has hydraulic delay relay made in the form of valve and discharging choke. Sizes of discharging chokes of delay hydraulic relays are selected for provision of delayed return of circulation valve to initial position with respect to that of check valve of pulse generator and packer. EFFECT: higher reliability and productivity, extended field of application, simplified well treatment technology. 5 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TESTING WELLS AND RESERVOIR SURVEY IN PROCESS OF BORING AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2008 |
|
RU2366813C1 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
METHOD FOR OPENING FORMATION CHARACTERIZED BY DISASTROUS LOST CIRCULATION BY DRILLING THEREOF | 2004 |
|
RU2259460C1 |
FORMATION PRESSURE MEASURING METHOD | 0 |
|
SU922271A1 |
METHOD OF ISOLATION OF LOST-CIRCULATION FORMATIONS | 2000 |
|
RU2172810C1 |
SET OF EQUIPMENT FOR MULTI-STAGE HYDRAULIC FRACTURING | 2022 |
|
RU2777032C1 |
TREATMENT METHOD OF BOREHOLE ZONE OF LOW-PERMEABLE BED AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2703093C2 |
CIRCULATION VALVE OF A DRILL STRING | 2021 |
|
RU2774306C1 |
EXPRESS METHOD FOR FIXING NATURAL AND ARTIFICIAL CRACKS IN BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION DURING THE INITIAL OPENING BY HORIZONTAL, INCLINED OR VERTICAL DRILLING | 2020 |
|
RU2755600C1 |
HYDRODYNAMIC METHOD FOR CHECKING RELIABILITY OF ISOLATION OF LOSS ZONES, CARRIED OUT BEFORE CEMENTING CASING STRINGS | 2023 |
|
RU2814947C1 |
Authors
Dates
2003-01-20—Published
2000-10-30—Filed