FIELD: well drilling, particularly, isolation of zones of lost-circulation and fractures of hydrofracturing of formation in string cementing. SUBSTANCE: method includes supply of calculated volume of grouting mortar with filler. Said volume is determined by formula Vp=Va+DwxL/a, where Va is volume of annular space with consideration of cavernosity, cu.m; Psp is specific pressure with consideration of relationship of opening of fractures of lost circulation and well pressure, Mpa; Dw is well diameter with consideration of cavernosity, m; L is well length in zone of minimum hydrofracturing gradient, m; a is hydrofracturing gradient of rocks of slightly consolidated bed, Mpa/m. EFFECT: provided rise of grouting mortar to planned height.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SHUTOFF OF WATER INFLOW OVER CEMENTING ANNULAR SPACE IN OPERATION OF OIL AND GAS WELLS | 2000 |
|
RU2196878C2 |
CASING STRING CEMENTING METHOD | 2018 |
|
RU2713540C2 |
METHOD OF CEMENTING PRODUCTION STRING IN WELLS WITH LOW ROCK HYDRAULIC FRACTURING GRADIENT | 0 |
|
SU1726735A1 |
DEVICE FOR WELL TREATMENT | 2000 |
|
RU2196886C2 |
WATER SHUT OFF METHOD | 2008 |
|
RU2374428C1 |
METHOD OF FORMATION ISOLATION | 2001 |
|
RU2187622C1 |
HYDRODYNAMIC METHOD FOR CHECKING RELIABILITY OF ISOLATION OF LOSS ZONES, CARRIED OUT BEFORE CEMENTING CASING STRINGS | 2023 |
|
RU2814947C1 |
METHOD FOR INSULATION OF ABSORPTION ZONES WHEN DRILLING WELLS | 2021 |
|
RU2778122C1 |
METHOD OF REINFORCEMENT OF LINING OF GAS WELLS | 1998 |
|
RU2166613C2 |
METHOD FOR CEMENTING THE CONDUCTOR, A TECHNICAL COLUMN DURING THE CONSTRUCTION OF WELLS | 2022 |
|
RU2792128C1 |
Authors
Dates
2001-08-27—Published
2000-02-29—Filed