FIELD: applicable in treatment of gas, gas and gas-condensate wells. SUBSTANCE: plant includes inlet separator for products of gas-condensate wells, recuperative heat exchanger, ejector, low-temperature separator, three-phase separators of the first and second stages and degasser. Plant is additionally provided with successively connected inlet separator for products of gas wells, recuperative gas-liquid heat-exchanger, throttle and control valve. Throttle outlet is connected with inlet of low-temperature separator. Lower part of low-temperature separator is connected via control valve to inlet of shell side of recuperative gas-liquid heat-exchanger; shell side outlet is connected with three-phase separator of the second stage. EFFECT: provided treatment of gas from two different horizons with different formation pressures and compositions by single plant with higher quality of gas treatment. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PLANT FOR PREPARATION AND PROCESSING OF HYDROCARBON MATERIALS OF GAS-CONDENSATE POOLS | 2000 |
|
RU2182035C1 |
METHOD OF FIELD PREPARATION OF A CONDENSATE-GASEOUS FLUID AND DE-ETHANIZATION OF THE CONDENSATE | 2003 |
|
RU2243815C1 |
METHOD OF FIELD PROCESSING OF GAS CONDENSATE DEPOSIT PRODUCTS USING UNSTABLE GAS CONDENSATE AS COOLANT AND PLANT TO THIS END | 2012 |
|
RU2493898C1 |
METHOD OF GAS CONDENSATE DEPOSITS COMPLEX PROCESSING WITH C+ HYDROCARBONS DEEP EXTRACTION AND PLANT FOR ITS IMPLEMENTATION | 2015 |
|
RU2615703C2 |
METHOD OF FIELD PREPARATION OF CONDENSATE POOL PRODUCTS WITH HIGH CONTENT OF HEAVY HYDROCARBONS AND PLANT TO THIS END | 2012 |
|
RU2500453C1 |
METHOD FOR GASEOUS HYDROCARBON PREPARATION FOR TRANSPORTATION | 2005 |
|
RU2294430C1 |
METHOD OF COLLECTION AND PREPARATION OF GAS-CONDENSATE MIXTURE FOR TRANSFER IN DEVELOPMENT OF GAS-CONDENSATE FIELDS AT HIGH FORMATION PRESSURE (VERSIONS) | 2000 |
|
RU2173203C1 |
METHOD OF PREPARING MIXTURE OF GASEOUS HYDROCARBONS FOR TRANSPORTATION | 2012 |
|
RU2497929C1 |
DEVICE FOR PREPARING MIXTURE OF GASEOUS HYDROCARBONS FOR TRANSPORTATION PURPOSE | 2012 |
|
RU2497928C1 |
METHOD FOR PREPARING NATURAL GAS AT THE FINAL STAGE OF DEVELOPMENT OF A GAS CONDENSATE FIELD | 2021 |
|
RU2775239C1 |
Authors
Dates
2003-01-20—Published
2000-10-30—Filed