FIELD: oil and gas industry. SUBSTANCE: way includes positioning of chambering-basting equipment and damping members in interval of productive bed to reduce effect of blast on downhole equipment, casing string and layer of cement stone in string clearance located away from point of blast. While conducting chambering-blasting operations in wells with sunk tubing string damping members are placed in lower part of tubing string and they come in the form of rigid rings put on outer surface of tubing string in number determined by analytical expression. In accordance with second variant damping members are positioned on pipe placed on one or both sides of chambering-blasting equipment in number also found by analytical expression. EFFECT: reduced harmful effect of blast on downhole equipment, casing string and cement stone located off point of blast. 3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INITIATION OF PERFORATORS RUN IN WITH TUBE STRING | 2012 |
|
RU2500881C1 |
CUMULATIVE PERFORATOR FOR WELL | 2004 |
|
RU2241115C1 |
CUMULATIVE WELL PERFORATOR | 2012 |
|
RU2487991C1 |
DEVICE FOR PERFORATION AND GAS-DYNAMIC TREATMENT OF FORMATION | 2000 |
|
RU2194151C2 |
HEAT GAS GENERATOR FOR IMPROVEMENT OF FORMATION FILTRATION IN ITS WELL BORE ZONE | 2010 |
|
RU2439312C1 |
FACILITY FOR IMPROVEMENT OF BED FILTRATION IN ITS BOTTOM HOLE ZONE | 2007 |
|
RU2338055C1 |
JET PIPE CUTTER | 2004 |
|
RU2282013C1 |
CUMULATIVE SECTIONAL PERFORATOR FOR WELL | 2012 |
|
RU2492315C1 |
GAS GENERATOR ON SOLID FUEL FOR WELL | 2004 |
|
RU2242600C1 |
DEVICE FOR PERFORATION OF WELL AND FORMING CRACKS IN WELL-ADJACENT BED AREA | 2004 |
|
RU2242590C1 |
Authors
Dates
2003-04-10—Published
2000-02-18—Filed