FIELD: heat power engineering. SUBSTANCE: according to invention, in process of temperature regulation of heating system water of power-and-heat supply turboplant after peak heater connected to turbine chamber by steam supply pipeline with regulator installed in pipeline, steam is fed to regulator from two or more turbine chambers, steam pressure in said chambers is measured and, basing of pressure measurements, steam saturation temperature in each chamber is calculated, absolute difference of steam saturation temperature and preset heating temperature of heating system water is determined and then steam is supplied to regulator from chamber in which said difference is minimum, and at full opening of regulator afterheating of heating system water is carried out by acting onto steam distributing members of turbine high pressure part. EFFECT: increased economy of power-and-heat supply turboplant when regulating temperature of heating system water after peak heater. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REGULATION OF HEAT LOAD OF HEATING TURBINE PLANT | 2012 |
|
RU2518784C1 |
METHOD OF CONTROLLING HEAT LOAD OF EXTRACTION TURBINE PLANT | 0 |
|
SU1134737A1 |
METHOD OF TWO-STAGE DELIVERY WATER HEATING | 2014 |
|
RU2592008C2 |
METHOD OF CONTRROLLING HEAT LOAD TO EXTRACTION TURBINE PLANT | 0 |
|
SU1346824A2 |
METHOD OF REGULATING HEAT LOAD OF POWER-AND-HEAT SUPPLY TURBINE PLANT | 0 |
|
SU1395843A2 |
METHOD OF CONTROLLING STEAM EXTRACTION TURBINE PLANT | 0 |
|
SU1276839A1 |
SYSTEM FOR CASCADE DRAINAGE OF HEATING STEAM CONDENSATE OF EXTRACTION STEAM TURBINE PREHEATERS AT STEPPED PREHEATING OF HEATING-SYSTEM WATER | 2000 |
|
RU2167311C1 |
METHOD OF TWO-STEP HEATING OF HEATING-SYSTEM WATER | 0 |
|
SU956821A1 |
METHOD OF CONTROLLING LOAD OF HEAT GENERATING ELECTRIC POWER STATION | 0 |
|
SU840425A1 |
OPERATING METHOD OF HEAT EXTRACTION TURBINE PLANT WITH STEAM REHEAT | 2010 |
|
RU2429352C1 |
Authors
Dates
2003-05-20—Published
2000-12-05—Filed