FIELD: power industry.
SUBSTANCE: operating method of heat extraction turbine plant with steam reheat and consisting of turbine that includes IP and LP cylinders with reheated steam supply to IP cylinder, chamber of heating extraction with steam discharge from the chamber to delivery water heater and steam inlet member of LP cylinder where steam temperature is measured in heating extraction chamber, compared with maximum allowable value and when maximum allowable value is exceeded, steam inlet members of LP cylinder are opened until steam temperature in heating extraction chamber is compared with maximum allowable value.
EFFECT: invention allows providing steam temperature decrease in heating extraction chamber in variable conditions without reducing the turbine plant economy.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF MULTICYLINDER EXTRACTION TURBINE PLANT | 0 |
|
SU1574841A1 |
METHOD OF REGULATION OF HEAT LOAD OF HEATING TURBINE PLANT | 2012 |
|
RU2518784C1 |
OPERATION OF EXTRACTION TURBINE ACCORDING TO HEATING-LOAD CURVE | 1996 |
|
RU2112148C1 |
METHOD OF OPERATION OF EXTRACTION TURBINE ACCORDING TO THERMAL SCHEDULE | 1997 |
|
RU2133346C1 |
METHOD OF OPERATION OF POWER AND HEAT GENERATION PLANT | 1994 |
|
RU2079673C1 |
DUAL-PURPOSE TURBINE PLANT | 2011 |
|
RU2470163C2 |
METHOD OF OPERATION OF EXTRACTION TURBINE PLANT | 2006 |
|
RU2311542C1 |
METHOD OF OFF-LOADING OF HEAT-AND-POWER SUPPLY PLANTS | 0 |
|
SU1815342A1 |
HEAT GENERATING TURBINE OPERATION METHOD | 0 |
|
SU802569A1 |
METHOD OF CONTROLLING AIR-TIGHTNESS OF VACUUM SYSTEMS OF TURBO-INSTALLATIONS | 2015 |
|
RU2580850C1 |
Authors
Dates
2011-09-20—Published
2010-02-25—Filed