FIELD: oil producing industry; applicable in performance of works involved in equalization of injectivity profile in injection wells and inflow profile in producing wells. SUBSTANCE: method includes injection of plugging material resistant to acid under formation conditions, and injection of acid. Acidproof plugging material is used in form of clay-base material. Plugging material is forced into water-encroached interval of bottomhole zone by fresh water and process is let to be completed under pressure of fresh water. With maintained pressure of water forcing, new portions of plugging material are forced by fresh water until increase in water forcing. Then, well producing interval is subjected to general acid treatment. EFFECT: fuller equalization of profiles of injectivity or inflow in well.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TREATMENT OF WELL BOTTOM-HOLE ZONE | 2002 |
|
RU2206731C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF INJECTION WELL | 1997 |
|
RU2114295C1 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF WELL IN MULTILAYER OIL POOL | 2002 |
|
RU2208149C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF PRODUCING WELL | 1997 |
|
RU2114297C1 |
METHOD FOR TREATMENT OF WELL BOTTOM-HOLE ZONE | 1997 |
|
RU2114296C1 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE IN HORIZONTAL OR INCLINED WELLBORE | 2002 |
|
RU2209304C1 |
METHOD OF TREATMENT OF WELL BOTTOM-HOLE ZONE | 2002 |
|
RU2206732C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF INJECTION WELL | 1995 |
|
RU2084621C1 |
METHOD OF TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2014 |
|
RU2566344C1 |
METHOD OF BUTTOMHOLE ZONE TREATMENT | 2002 |
|
RU2208151C1 |
Authors
Dates
2003-07-10—Published
2002-10-24—Filed