FIELD: operation of underground storage tanks made in soluble rocks, particularly, in rock salt for storage of liquid and gaseous products, mainly, of hydrocarbon materials. SUBSTANCE: method provides for detection of cement ring leaking in well annular pressure of cemented sections. Novelty in claimed method is use of plugging mortar in form of concentrated brine heated up to 60-90 C with addition of mechanical impurities. Plugging mortar is held under pressure until brine crystallization and penetration of stick-plastic rocks into fracturing zone. EFFECT: higher efficiency of repair of process wells of underground storage tanks. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SALT WATER FILLED SUBSURFACE TANK WELL SEALING | 2007 |
|
RU2348793C1 |
METHOD OF REPAIRING WELLS OF UNDERGROUND RESERVOIRS | 2007 |
|
RU2352754C1 |
METHOD OF SECONDARY CEMENTING OF PROCESS WELL OF UNDERGROUND RESERVOIRS OF VARIOUS PURPOSE | 2012 |
|
RU2485283C1 |
METHOD FOR ELIMINATION OF FLUID CROSSFLOWS IN A WELL | 2018 |
|
RU2702455C1 |
PROCESS OF PRESSURE GROUTING OF WELL | 2000 |
|
RU2183253C2 |
CASING CEMENTING JOB | 2001 |
|
RU2203389C2 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
METHOD OF FASTENING THE WELL WITH LEADER IN THE SECTION OF PERMAFROST WITH HIGH ICE CONTENT | 2017 |
|
RU2662830C1 |
METHOD TO FIX PROCESS WELLS OF UNDERGROUND STORAGES OF GASEOUS AND LIQUID HYDROCARBONS (VERSIONS) | 2015 |
|
RU2576416C1 |
METHOD OF SHUTOFF OF WATER INFLOW OVER CEMENTING ANNULAR SPACE IN OPERATION OF OIL AND GAS WELLS | 2000 |
|
RU2196878C2 |
Authors
Dates
2003-08-27—Published
2001-12-27—Filed