FIELD: oil and gas industry.
SUBSTANCE: lower portion of a pipe production string is perforated; an artificial working face is created in an open hole of a production well at series introduction of separating liquid and light-weight cement grouting. Process well is exposed for the waiting-on-cement period. The open hole of that well is expanded; lower part of the pipe production string is cemented. The artificial working face is drilled in vertical plane; an additional casing string is lowered below the shoe of the production string and cemented to the well head.
EFFECT: improving reliability and quality of tightness of the production string of the production well.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO FIX PROCESS WELLS OF UNDERGROUND STORAGES OF GASEOUS AND LIQUID HYDROCARBONS (VERSIONS) | 2015 |
|
RU2576416C1 |
METHOD OF REPAIRING WELLS OF UNDERGROUND RESERVOIRS | 2007 |
|
RU2352754C1 |
0 |
|
SU1778046A1 | |
METHOD OF REPAIR OF WELLS OF UNDERGROUND STORAGE TANKS | 2001 |
|
RU2211300C1 |
METHOD OF SALT WATER FILLED SUBSURFACE TANK WELL SEALING | 2007 |
|
RU2348793C1 |
METHOD FOR CREATING SEPARATING LAYER ON SURFACE OF SATURATED SOLUTION OF SODIUM CHLORIDE IN UNDERGROUND TANK | 2010 |
|
RU2438004C1 |
WELL COMPLETION METHOD | 2005 |
|
RU2304697C1 |
WELL CEMENTING METHOD UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2021 |
|
RU2775319C1 |
METHOD FOR REDUCTION OF HEAT EXCHANGE IN THE WELL AT DEVELOPMENT OF MULTILAYER DEPOSIT | 2015 |
|
RU2591325C9 |
COMPLETION METHOD OF HORIZONTAL WELL | 2014 |
|
RU2541979C1 |
Authors
Dates
2013-06-20—Published
2012-01-20—Filed