FIELD: hole drilling. SUBSTANCE: method includes hole washing with mud with rotation and reciprocating of drill stem assembly with eccentrics. Borehole is cleaned from sludge by lifting drill stem assembly at depths with distance between them determined by length of drill stem assembly with eccentrics plus length of working rod for time required for carrying-out of sludge to surface with mud flow from interval of residence of said assembly with eccentrics. In borehole sections with zenith angle up to 15- 20 deg., washing of borehole is carried out within intervals of caverns. In inclined and horizontal sections of borehole, washing with mud is effected from hole bottom to depth at which zenith angle becomes less than 15-20 deg. EFFECT: higher efficiency of cleaning of inclined, horizontal and cavernous sections of boreholes.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL CONSOLIDATION AND DEVICE FOR METHOD EMBODIMENT | 2000 |
|
RU2196879C2 |
METHOD OF RESTORATION OF WELLBORE PASSABILITY AFTER WALL CAVING | 1999 |
|
RU2171352C2 |
PROCEDURE FOR CONSTRUCTION OF HORIZONTAL WELL IN DEVONIAN STRATA | 2009 |
|
RU2421586C1 |
PROCESS OF PRESSURE GROUTING OF WELL | 2000 |
|
RU2183253C2 |
DEVICE FOR FILLING OF CAVERNS WITH CEMENT GROUT | 1999 |
|
RU2178512C2 |
STRING OF PIPING FOR BORING AND OPERATING HORIZONTAL AND SLANTING WELLS | 2001 |
|
RU2227199C2 |
PROCESS OF DRILLING OF ADDITIONAL SHAFT OF WELL | 2000 |
|
RU2182637C1 |
METHOD FOR WELL CONSTRUCTION | 2012 |
|
RU2494214C1 |
CENTRALIZER AND CASING STRING | 2001 |
|
RU2209291C1 |
WELL COMPLETION METHOD | 2018 |
|
RU2723815C1 |
Authors
Dates
2003-10-10—Published
2001-07-16—Filed