FIELD: excavation f concretions from seal floor and their transportation over pressure pipe-line to base vessel. SUBSTANCE: facility includes base vessel, mobile floor set with intake fixture, pressure pipe-line, perforated branch pipe showing holes which size is smaller than minimal size of mined concretions. Perforated branch pipe is put on section of pressure pipe- line bordering on floor set. Cross-section area of perforated branch pipe diminishes towards floor set. Length of perforated branch pipe and diameter of pressure pipe-line after perforated branch pipe in way of motion of hydraulic mixture are found from mathematical expressions. EFFECT: decreased energy consumption for transportation of concretions, reduced diameter, usage of metal and cost of pressure pipe-line, improved ecological situation in area of mining of concretions, decreased installed capacity of power plant. 2 cl, 5 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| DEVICE FOR EXTRACTING CONCRETIONS FROM SEABED | 2002 | 
 | RU2228441C1 | 
| DEVICE FOR EXTRACTING CONCRETIONS FROM SEA BOTTOM | 2004 | 
 | RU2260696C1 | 
| DEVICE FOR EXTRACTING CONCRETIONS | 2003 | 
 | RU2244128C1 | 
| DEVICE FOR CONCRETION PRODUCTION FROM SEABED | 2004 | 
 | RU2269651C1 | 
| COMPLEX FOR EXTRACTING CONCRETIONS FROM SEA BOTTOM | 2004 | 
 | RU2260695C1 | 
| DEVICE TO CONVEY EXTRACTED CONCRETION TO TRANSPORT SHIP | 2004 | 
 | RU2266998C1 | 
| DEVICE TO EXTRACT CONCRETIONS FROM SEA BOTTOM | 2008 | 
 | RU2350752C1 | 
| ASSEMBLY FOR EXTRACTING BURS FROM SEA BOTTOM | 2007 | 
 | RU2353774C1 | 
| COMPLEX FOR EXTRACTION OF CONCRETIONS | 2008 | 
 | RU2358106C1 | 
| CONCRETION EXTRACTION COMPLEX | 2008 | 
 | RU2359128C1 | 
Authors
Dates
2003-12-20—Published
2002-06-20—Filed