FIELD: excavation f concretions from seal floor and their transportation over pressure pipe-line to base vessel. SUBSTANCE: facility includes base vessel, mobile floor set with intake fixture, pressure pipe-line, perforated branch pipe showing holes which size is smaller than minimal size of mined concretions. Perforated branch pipe is put on section of pressure pipe- line bordering on floor set. Cross-section area of perforated branch pipe diminishes towards floor set. Length of perforated branch pipe and diameter of pressure pipe-line after perforated branch pipe in way of motion of hydraulic mixture are found from mathematical expressions. EFFECT: decreased energy consumption for transportation of concretions, reduced diameter, usage of metal and cost of pressure pipe-line, improved ecological situation in area of mining of concretions, decreased installed capacity of power plant. 2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR EXTRACTING CONCRETIONS FROM SEABED | 2002 |
|
RU2228441C1 |
DEVICE FOR EXTRACTING CONCRETIONS FROM SEA BOTTOM | 2004 |
|
RU2260696C1 |
DEVICE FOR EXTRACTING CONCRETIONS | 2003 |
|
RU2244128C1 |
DEVICE FOR CONCRETION PRODUCTION FROM SEABED | 2004 |
|
RU2269651C1 |
COMPLEX FOR EXTRACTING CONCRETIONS FROM SEA BOTTOM | 2004 |
|
RU2260695C1 |
DEVICE TO CONVEY EXTRACTED CONCRETION TO TRANSPORT SHIP | 2004 |
|
RU2266998C1 |
DEVICE TO EXTRACT CONCRETIONS FROM SEA BOTTOM | 2008 |
|
RU2350752C1 |
ASSEMBLY FOR EXTRACTING BURS FROM SEA BOTTOM | 2007 |
|
RU2353774C1 |
COMPLEX FOR EXTRACTION OF CONCRETIONS | 2008 |
|
RU2358106C1 |
CONCRETION EXTRACTION COMPLEX | 2008 |
|
RU2359128C1 |
Authors
Dates
2003-12-20—Published
2002-06-20—Filed