FIELD: metallurgy; blast furnace processes; lining areas near tap holes and other components of furnace. SUBSTANCE: proposed method includes mixing refractory components for obtaining refractory concrete, placing forms in area of damaged lining, filling the forms with concrete and holding it for 10-24 h at simultaneous heating of concrete mix to 150-180 C followed by removing the forms and calcination to 800-1000 C for obtaining strong adhesion of particles of concrete mix between each other and to wall of brick-work; holding time is equal to 10-12 h. Used as refractory concrete is mixture of alumo-carbide silicon composition at moisture content of 5- 6%. EFFECT: enhanced resistance of lining. 3 cl, 2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIRING STEEL-TAPPING HOLE OF BASIC OXYGEN FURNACE | 2015 |
|
RU2607391C2 |
METHOD OF FABRICATION OF PRODUCTS FROM REFRACTORY MASS (VERSIONS) | 2007 |
|
RU2348595C2 |
IRON NOTCH OF BLAST FURNACE | 2008 |
|
RU2370545C1 |
METHOD FOR MAKING LADLE LINING, REFRACTORY MASS FOR MAKING LINING AND LADLE FOR TRANSPORTING MELT METAL | 1999 |
|
RU2147485C1 |
METHOD FOR PROTECTING LADLE CAR FROM GROWING OVER AT MELTING IRONS WITH INCREASED CONTENT OF TITANOMAGNETITES | 2000 |
|
RU2179908C1 |
ARRANGEMENT FOR LETTING OUT MELT PRODUCTS FROM BLAST FURNACE | 0 |
|
SU1073284A1 |
METHOD OF BLAST FURNACE MAIN CHUTE LINING REPAIR | 2023 |
|
RU2823415C1 |
METHOD OF GUNITING STEEL-TAPPING HOLE OF METALLURGICAL UNIT | 2002 |
|
RU2214459C1 |
METHOD FOR BLOWING-IN OF BLAST FURNACE AFTER LINING REPAIR BY METHOD OF GUNNING | 2007 |
|
RU2350657C2 |
BLAST FURNACE PROFILE FOR HIGH-INTENSITY OPERATION | 2019 |
|
RU2722947C1 |
Authors
Dates
2004-03-20—Published
2002-01-03—Filed