FIELD: oil extracting industry. SUBSTANCE: method includes influencing the extraction area of layer by means of alternating impulses of pressure and discharging. Pressure from extraction area is dumped into previously mounted in the well and steam-blown tubing column, provided with impulse generator. Impulse generator includes packer, valve for connecting ring-shaped intertubular space with well extraction area, and valve for connecting extraction area with the inside of tubing column. Ring-shaped intertubular space is separated from extraction area by packer of impulse generator. Discharge impulses are performed by dumping pressure from extraction area into tubing column. Tubing column is displaced downwards for closing the valve, connecting ring-shaped intertubular space with well extraction area, and then opening the valve, connecting extraction area with the inside of tubing column. Pressure impulses onto extraction area from fluid-filled ring-shaped intertubular space are performed by upward displacement of tubing column for closing the valve, connecting extraction area with the inside of tubing column, and then opening the valve, connecting ring-shaped intertubular space with well extraction area. EFFECT: simplified technology of exerting influence upon layer extraction area. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND ARRANGEMENT OF HYDRAM FOR BOTTOMHOLE FORMATION AREA AND WELL DEVELOPMENT | 2013 |
|
RU2534116C1 |
METHOD OF SYNERGETIC REACTANT-IMPULSE-WAVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND PLANT FOR ITS IMPLEMENTATION | 2010 |
|
RU2462586C2 |
METHOD AND DEVICE FOR REAGENT AND IMPULSE WELL AND PRODUCTIVE BED TREATMENT | 2005 |
|
RU2275495C1 |
NANO-WAVE METHOD OF BOTTOM HOLE ZONE TREATMENT, EQUIPMENT AND PRESSURE MULTIPLIER | 2007 |
|
RU2376454C2 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION, PRESSURE IMPULSE GENERATOR | 2007 |
|
RU2376455C2 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
METHOD FOR TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND DEVICE FOR ITS REALIZATION | 1989 |
|
SU1739699A1 |
WELL OPERATION METHOD | 2006 |
|
RU2295633C1 |
METHOD FOR DEVELOPING WELL AFTER HYDRAULIC FRACTURING | 2016 |
|
RU2630930C1 |
METHOD OF LIFTING WATER FROM WELLS | 2011 |
|
RU2465442C1 |
Authors
Dates
2004-04-20—Published
2001-12-20—Filed