FIELD: oil and gas production.
SUBSTANCE: in compliance with this method, well is equipped with casing string and flow string with check valve at its bottom. Second smaller-diameter flow string with check valve at its bottom is fitted inside first flow string. Water is lifted via second flow string annulus by gas injected cyclically into annulus. Note here that fluid level in said annulus is not allowed to drop to smaller-diameter flow string bottom. To force fluid influx from the bed, required-pressure gas is forced in depressor-repressor mode into annulus at closed shutoff valves in exhaust line.
EFFECT: simplified process, better ecology, rediced losses.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LIFTING OF FLUID FROM WELL | 2006 |
|
RU2330936C2 |
LONG-STROKE DEEP-WELL PUMPING UNIT | 1997 |
|
RU2125185C1 |
METHOD AND DEVICE FOR WELL BOTTOM ZONE DEVELOPMENT AND CLEANING BY IMPULSE DRAINAGE | 2004 |
|
RU2272902C1 |
TREATMENT AND CLEANUP METHOD OF BOTTOM-HOLE ZONE, AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2555718C1 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF THE WELL | 2019 |
|
RU2708647C1 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
METHOD FOR DEVELOPMENT OF RESERVOIR OF HIGH-VISCOUS OIL | 2009 |
|
RU2405929C1 |
PROCESS AND GEAR FOR DEVELOPMENT AND CLEARING OF FACE ZONE OF WELLS BY PULSE DRAINAGE | 1999 |
|
RU2159326C1 |
OIL WITH HIGH GAS CONTENT PRODUCTION METHOD FROM WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2667182C1 |
METHOD FOR REMOVING LIQUID FROM WELLS AND BHZ BY HYDROPNEUMATIC SWABBING | 2021 |
|
RU2753721C1 |
Authors
Dates
2012-10-27—Published
2011-04-13—Filed