FIELD: gas extraction industry. SUBSTANCE: method includes opening of productive layers, trying out of extraction well, mounting of means for water jetting, boring of auxiliary wells, mounting of filtering strings in water jetting means and pumping of gravel mixture. According to the method, filtering strings of auxiliary wells are made with interval-wise perforation with overlapping of power of each productive layer from the side of roof and floor, and water jetting is performed in the floor and roof and in intervals of least resistance to water jetting for each productive layer. EFFECT: increased effectiveness of gas extraction from multi-layer coal deposit. 2 cl, 1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OUTFITTING A FILTER WELL | 2005 |
|
RU2293177C1 |
METHOD OF FILTRATION WELL COMPLETION | 0 |
|
SU1709076A1 |
SYSTEM FOR PRODUCTIVE RESERVOIR DEVELOPMENT | 2004 |
|
RU2272126C1 |
METHOD AND TOOL FOR FILTERING WELL CONSTRUCTION | 2003 |
|
RU2250309C1 |
METHOD AND TOOL FOR CONSTRUCTION OF FILTERING WELL | 2003 |
|
RU2250358C1 |
METHOD FOR DEVELOPMENT OF RESERVOIR NON-UNIFORM BY PERMEABILITY FROM ROOF TO SOLE, SATURATED WITH OIL AND UNDERLYING WATER | 2021 |
|
RU2778703C1 |
TOOL FOR CONSTRUCTION OF FILTERED WELL | 2001 |
|
RU2209943C1 |
DEVICE FOR EXTRACTION FROM TWO ZONES OF A WELL | 2003 |
|
RU2247229C1 |
METHOD AND APPARATUS FOR FILTER WELL FORMING | 2003 |
|
RU2252303C1 |
DEVICE FOR WELL DUAL-ZONE PRODUCTION | 2001 |
|
RU2206723C1 |
Authors
Dates
2004-05-10—Published
2002-12-05—Filed