FIELD: heat power engineering. SUBSTANCE: proposed thermal power station contains steam turbine with condenser connected by turbine main condensate pipeline with fitted-in low pressure regenerative heaters to high-pressure deaerator, additional feed water vacuum deaerator with heating agent and source water pipe-lines, water-to-water heater placed in source water pipeline, lower and upper system heaters connected by heating medium line to lower and upper heating extractions of turbine. Water-to water heater is connected by heating medium line to condensate line of upper system heater. Cooled condensate pipeline of upper system heater is connected after water-to-water heater to main condensate pipeline after first low-pressure heater in direction of main condensate flow. Deaerated additional feed water pipeline is connected to turbine main condensate pipeline after second low-pressure heater in direction of main condensate flow. EFFECT: increased economy and improved reliability of thermal power station. 3 cl, 1 dwg _
Title | Year | Author | Number |
---|---|---|---|
THERMAL POWER STATION | 2001 |
|
RU2214516C2 |
THERMAL POWER STATION | 2001 |
|
RU2214517C2 |
THERMAL POWER STATION | 2001 |
|
RU2214515C2 |
METHOD FOR OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214521C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214518C2 |
THERMAL POWER STATION | 2002 |
|
RU2211929C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214523C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214520C2 |
THERMAL POWER STATION | 2001 |
|
RU2214519C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2001 |
|
RU2214522C2 |
Authors
Dates
2004-05-10—Published
2001-12-28—Filed