FIELD: oil and gas extracting industry. SUBSTANCE: method includes measuring pH of treated area, cyclic treatment of bed with modification of pH of treated area, which includes pumping of chemical reagent-oxidizer or reagent-deoxidizer solution with pH which is opposite to pH of treated area, and which contains surfactant in amount of no less than 0.5 per cents of mass, delay for reaction is performed, separating neutral fringe is pumped, as separating neutral fringe 0.05-0.5 per cent solution of water-soluble polymer on drainage or any mineralized water, containing 0.5-2.0 per cents of mass of Polisyl. After pumping of said fringe ultrasonic generator is placed, ultraviolet radiation frequency range of which can be of following values: 10-15, 22-24, 320-960 kHz. During delay for reaction, lowering of packaging is performed with cyclic hydraulic percussions with pressure from 5 to 40 mPa in amount up to 8 for one lowering of packaging. EFFECT: increased effectiveness of productive bed treatment due to better filtering properties of pumped compound in acidic environment and due to complex methods for destroying compacting substances, expansion of method implementation area due to increased effectiveness of treatment of productive layers substantially distant from the well for increasing effectiveness of deposits excavation. 3 cl, 3 ex, 2 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATING PRODUCTIVE BED | 1996 |
|
RU2102591C1 |
PROCEDURE FOR DEVELOPMENT OF NON-UNIFORM RESERVOIR | 2008 |
|
RU2401939C2 |
PROCEDURE FOR DEVELOPMENT OF NON-UNIFORM OIL RESERVOIR | 2009 |
|
RU2394155C1 |
METHOD FOR TREATMENT OF INJECTION WELL | 1992 |
|
RU2043492C1 |
METHOD FOR REAGENT TREATMENT OF WELL | 1992 |
|
RU2042803C1 |
METHOD OF INSULATING WASHED HIGH-PERMEABILITY ZONES OF PRODUCTIVE FORMATION | 1998 |
|
RU2136870C1 |
METHOD FOR REAGENT TREATMENT OF WELL | 1997 |
|
RU2106484C1 |
INSULATION METHOD OF FORMATION WATER INFLOW AND LINING METHOD OF BOTTOM-HOLE FORMATION ZONE | 2013 |
|
RU2554957C2 |
METHOD FOR TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2023 |
|
RU2819357C1 |
METHOD OF DEVELOPMENT OF OIL POOL WITH ARGILLIFEROUS RESERVOIR | 2013 |
|
RU2547868C1 |
Authors
Dates
2004-06-10—Published
2002-02-28—Filed