FIELD: oil extracting industry.
SUBSTANCE: at location of welded joint polymer tape is applied having adhesive layer and providing for adhesive connection to metal of pipe. Moisture from polymer tape surface is removed by means of heating by open flame. Upon polymer tape, thermoshrinking tape is applied in spliced manner, with spliced area located on side surface of pipeline. Completed connection is crimped. Heating is performed by open flame at first from below, then from above, then on side surface from the opposite side from spliced area and finished with heating of the very spliced area.
EFFECT: higher reliability of welded joint isolation.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR APPLICATION OF INSULATING COLLAR ON PIPE COUPLING | 2008 |
|
RU2397404C1 |
METHOD OF FIREPROOF AND HEAT INSULATION OF WELDED JOINTS OF PREVIOUSLY INSULATED PIPES IN CASE OF ABOVE-GROUND PIPELINES | 2014 |
|
RU2575533C2 |
METHOD OF HEAT INSULATION OF WELDED JOINTS OF PREVIOUSLY INSULATED PIPES IN CASE OF UNDER-GROUND PIPELINES | 2014 |
|
RU2575528C2 |
METHOD OF HEAT INSULATION OF WELDED JOINTS OF PREVIOUSLY INSULATED PIPES IN CASE OF ABOVE-GROUND PIPELINES | 2014 |
|
RU2575522C2 |
EXTERNAL INSULATION OF PIPELINE JOINT OF STEEL PIPES WITH OUTER COATING | 2012 |
|
RU2527282C2 |
METHOD OF APPLYING INSULATING GASKET ON PIPE JOINT | 2011 |
|
RU2488737C2 |
PROCEDURE FOR ANTI-CORROSION INSULATION OF WELDING JOINT OF PIPELINE AND FACILITY FOR ITS IMPLEMENTATION | 2008 |
|
RU2398155C2 |
HEAT INSULATION BUTT JOINT FOR PIPELINES AND METHOD OF ITS ASSEMBLING | 2002 |
|
RU2235246C2 |
ASSEMBLY OF PIPE WELD HEAT ISOLATION FOR UNDERGROUND LAYING | 2012 |
|
RU2530946C2 |
METHOD OF ASSEMBLY OF PIPE HEAT INSULATION ANTI-FIRE INSERTS | 2012 |
|
RU2530949C2 |
Authors
Dates
2004-06-20—Published
2003-06-30—Filed