FIELD: development of oil deposits, in particular, extraction of high-viscosity oil by exposing bed to thermal effects.
SUBSTANCE: method involves drilling vertical well; lowering and cementing operating column followed by perforation process; lowering pump-and-compressor pipes and bull pump; hermetically sealing cavity outside pipe by, for example, packer; injecting heat-carrier into well; extracting oil; providing short-wall of vertical well shaft below oil bed bottom so as to form hermetically sealed cement sleeve; drilling side shaft from vertical shaft, with side shaft mouth being arranged above oil-bearing bed roof and its short-wall above water-oil interface; casing side shaft with non-cemented slit-shaped shank; injecting heat-carrier into side shaft; extracting oil from well vertical shaft by means of bull pump mounted on face.
EFFECT: increased oil yield owing to increased steam injection rate and improved bull pump operating conditions during working of weakly cemented low-pressure productive beds in case of availability of water-bearing bed.
3 cl, 2 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR IMPROVING PERMEABILITY OF BED DURING EXTRACTION OF HIGH-VISCOSITY OIL | 2010 |
|
RU2418162C1 |
METHOD FOR EXTRACTING RESERVOIRS OF HIGHLY VISCOUS OIL OR BITUMEN | 2005 |
|
RU2289685C1 |
PRODUCTION METHOD OF HIGH-VISCOUS OIL BY MEANS OF SIMULTANEOUS PUMPING OF STEAM AND EXTRACTION OF LIQUID FROM SINGLE HORIZONTAL WELL | 2011 |
|
RU2456441C1 |
METHOD OF PRODUCING BITUMINOUS OIL FROM A HORIZONTAL WELL | 2018 |
|
RU2733563C2 |
BOREHOLE PUMPING UNIT FOR THE EXTRACTION OF BITUMINOUS OIL | 2021 |
|
RU2773651C1 |
DOWNHOLE PUMP UNIT FOR PRODUCTION OF BITUMINOUS OIL | 2015 |
|
RU2595032C1 |
METHOD OF ACTION ON PRE-BOTTOM ZONE OF WELL IN HYDROCARBON FIELD WITH BOTTOM WATER AND RECOVERY OF OIL AND WATER BY PUMPS-COMPRESSORS WITH SEPARATE INTAKE FOR CONELESS OPERATION OF WELL | 2005 |
|
RU2293214C2 |
PROCEDURE FOR EXTRACTION OF HIGH VISCOUS OIL FROM DEVIATING HOLE BY METHOD OF STEAM CYCLIC PUMPING INTO RESERVOIR | 2010 |
|
RU2436943C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES | 2010 |
|
RU2442883C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2017 |
|
RU2669950C1 |
Authors
Dates
2004-07-10—Published
2002-05-27—Filed