FIELD: shipbuilding; transportation of upper structure to fixed offshore platform.
SUBSTANCE: proposed method includes heeling the water craft without cargo for determination of its mass and then cargo is placed on water craft and water craft is again subjected to heeling with cargo on its deck. Mass of water craft with and without cargo is compared and mass of cargo and its coordinates of mass are determined.
EFFECT: facilitated procedure; reduced labor consumption; enhanced accuracy of determination of mass of cargo.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
0 |
|
SU1781384A1 | |
MARINE SELF-PROPELLED SELF-ELEVATING CRANE VESSEL | 2015 |
|
RU2603423C1 |
METHOD TO PERFORM UNDERWATER TECHNICAL WORKS DURING INSTALLATION OF BULK ITEMS AND DEVICE FOR ITS REALISATION | 2012 |
|
RU2495197C1 |
CONNECTION UNIT OF RISER AND UNDERWATER PIPELINE OF STATIONARY SEA PLATFORM | 0 |
|
SU1702053A1 |
FLOATING PLATFORM FOR MARINE STRUCTURES AND RAISING OF SUNKEN VESSELS | 2003 |
|
RU2261818C2 |
DEVICE FOR BUILDING SUPERSTRUCTURE OF OFF-SHORE STATIONARY PLATFORM | 0 |
|
SU1687744A1 |
FLOATING FACILITY FOR DRILLING WELLS FROM SUPPORT UNITS | 2008 |
|
RU2392380C1 |
METHOD FOR TRANSPORTATION OF SELF-LIFTING FLOATING DRILLING RIG | 2019 |
|
RU2719650C1 |
WAVE-RESISTANT SEA LOAD PLATFORM (WRLP) | 2014 |
|
RU2561491C1 |
METHOD OF CAREENING A FLOATING OBJECT | 0 |
|
SU979198A1 |
Authors
Dates
2004-08-20—Published
2001-06-25—Filed