FIELD: oil extractive industry.
SUBSTANCE: method includes drilling of force-pumping and extracting wells, pumping of pushing liquid into force-pumping well and extraction of bed product through extracting well. Portion of non-rentable extracting and force-pumping wells from highly permeable highly watered beds is converted to extraction of less-watered higher beds with forming of system of extraction on basis of thickened mesh. Oil extraction from highly permeable highly watered beds is continued according to dispersed mesh by remaining extracting wells left in hypsometrically lowered portions of deposit. Product extraction from extracting wells is performed while performing operations on providing for rentable debit due to prevention of forming of water cone.
EFFECT: possible extraction of oil deposits with rentable well debit.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTIFORMATION OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2474676C1 |
WELL STRUCTURE AND METHOD OF MULTIPAY OIL POOL DEVELOPMENT | 2007 |
|
RU2344272C2 |
METHOD FOR EXTRACTING MULTI-BED OIL DEPOSIT | 2006 |
|
RU2290493C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2010 |
|
RU2417306C1 |
METHOD FOR DEVELOPMENT OF STRATIFIED OIL DEPOSITS | 2012 |
|
RU2513955C1 |
METHOD FOR DEVELOPING OIL DEPOSITS | 2023 |
|
RU2812976C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2453689C1 |
DEVELOPMENT OF LOW-PERMEABILITY OIL POOLS BY HORIZONTAL WELLS WITH MAINTENANCE OF SEAM PRESSURE | 2013 |
|
RU2526430C1 |
METHOD FOR MULTIPAY OIL FIELD DEVELOPMENT | 2005 |
|
RU2307923C2 |
METHOD OF OIL POOL DEVELOPMENT AT LATE STAGE | 2000 |
|
RU2178517C2 |
Authors
Dates
2004-09-10—Published
2003-03-13—Filed