METHOD OF BRIDGE BUILDING OVER WATER BODY Russian patent published in 2004 - IPC

Abstract RU 2237123 C1

FIELD: bridge building.

SUBSTANCE: method involves building supports on drilled piers connected one to another by grillage in water area with the use of self-lifting platform installed on drive inventory strings and on floating crane; assembling of metal span structures by back-conveyor method; moving metal span structures or transporting span structures by floating thereof; installing span structures in design position with rigid bridge forming. Floating crane is moved to support building area to create gauge piles. Guide conductor with cells arranged coaxially to support pile axes are installed on gauge piles. Self-lifting platform is formed as non-self-propelled pontoon. The pontoon has through shafts for columns installation, air and gauge-and-drying pipe system and spaced paired limiting members mounted on pontoon deck along sides thereof. Limiting members are arranged from pontoon side facing conductor. Limiting members are preferably made of channel bars with flanged facing each other. Gap between channel bars is filled with powder material. Reinforced concrete panels are laid on the top of powder material layer. Drill machine is movably installed on reinforced concrete panels so that drill machine may be displaced along pontoon. Pile is formed with the use of drill machine and protective pipes in accordance to above method. Then grillage and support body are concreted.

EFFECT: reduced material consumption and labor inputs, reduced building time due to improved manufacturability and work automation.

12 dwg

Similar patents RU2237123C1

Title Year Author Number
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA 2023
  • Konnykh Andrej Albertovich
  • Sukhorukov Aleksej Aleksandrovich
  • Romanov Dmitrij Vyacheslavovich
  • Kolyushev Igor Evgenevich
  • Lyutyj Sergej Mikhajlovich
  • Malygin Evgenij Gennadevich
RU2809049C1
CONSTRUCTIVE AND TECHNOLOGICAL SOLUTION FOR FOUNDATION OF INTERMEDIATE SUPPORT OF HIGH PILE WORK TYPE CONSTRUCTED IN TEMPORARY ENCLOSING STRUCTURE 2023
  • Kolyushev Igor' Evgen'Evich
  • Nikolaev Vasilij Evgen'Evich
  • Nikolaev Artem Aleksandrovich
  • Malan'In Aleksandr Viktorovich
  • Zimirev Oleg Nikolaevich
  • Malygin Evgenij Gennad'Evich
RU2807350C1
PROTECTIVE CASE FOR BRIDGE PIER GRILLAGE AND ERECTION METHOD THEREOF 2004
  • Pavljukov Ju.A.
  • Velichko V.S.
  • Morozov V.N.
  • Likverman A.I.
RU2263176C1
METHOD FOR PILE FOUNDATION AND BRIDGE SUPPORT ERECTION 2006
  • Blejan Jurij Grantovich
  • Khlopkov Sergej Aleksandrovich
  • Novikov Aleksandr Nikolaevich
  • Kuzakhmetov Valerij Bogapovich
  • Chalenko Vasilij Vasil'Evich
RU2303674C1
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT 1999
  • Gapontsev E.G.
  • Dorman I.Ja.
  • Isakov V.V.
  • Korotin V.N.
  • Kobzev G.N.
  • Monov B.N.
  • Onishchuk V.M.
  • Ostrovskij A.V.
  • Platonov Ju.P.
  • Ryzhikov A.V.
  • Selivanov N.P.
  • Shmidt V.I.
RU2152477C1
METHOD FOR ERECTING FOUNDATION 1993
  • Sakharov Oleg Aleksandrovich
RU2063497C1
METHOD FOR FORMATION OF CLOSED SECTION OF WATER AREA BOTTOM WITH POSSIBILITY OF ITS DRYING AND SYSTEM, WHICH REALISES IT 2008
  • Petrov Nikolaj Ivanovich
  • Korostyshevskij Vladimir Jakovlevich
RU2382142C2
METHOD OF COMBINED BUILDING OF UNDERGROUND AND ABOVE-GROUND PART OF FRAME STRUCTURE 2017
  • Khafizov Tagir Mavlitovich
  • Bajburin Albert Khalitovich
  • Denisov Sergej Egorovich
  • Sulejmanov Renat Maratovich
  • Khafizov Gleb Tagirovich
RU2657565C1
METHOD OF RECONSTRUCTION OF BRIDGEWORK WITH DISPLACEMENT OF RAILWAY BRIDGE FRAMEWORK AFLOAT AND ERECTION OF PEDESTRIAN BRIDGE 2000
RU2198978C2
DRILLING METHOD TO ERECT STRIP FOUNDATION IN WATER-BEARING SOILS 2010
  • Ponomarenko Jurij Viktorovich
  • Mel'Nikova Ljudmila Petrovna
  • Moskovchenko Galina Jur'Evna
RU2415228C1

RU 2 237 123 C1

Authors

Kostylev V.V.

Sur E.G.

Dates

2004-09-27Published

2004-01-29Filed