FIELD: oil extractive industry.
SUBSTANCE: method includes drilling wells according to certain mesh schematics, feeding displacing agent through force wells and extracting bed fluids through product wells. Drilling of wells is performed according to radial mesh. Force wells are placed along productive bed closer to upper limit of bed along most penetrable seams. Extracting wells are placed closer to lower limit of bed. At starting stage of extraction in all wells thermo-cyclic treatment of bed is performed with steam stimulation. Then, extraction of bed fluids is started through product wells with area effect on a bed through force wells.
EFFECT: higher productiveness of bed due to heat carrier treatment, lower areas of terrain used for wells drilling and later operation, better ecological factor of technological process.
1 ex, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES | 2010 |
|
RU2442883C1 |
DEVELOPMENT METHOD OF HIGH-VISCOUS OIL AND BITUMEN FIELDS WITH WELLS WITH INCLINED HORIZONTAL SECTIONS | 2008 |
|
RU2368766C1 |
METHOD FOR HIGHLY-VISCOUS OIL OR BITUMEN DEPOSIT DEVELOPMENT | 2006 |
|
RU2286445C1 |
METHOD OF HIGH-VISCOSITY OILS AND BITUMENS POOLS DEVELOPMENT BY STRAIGHT-HORIZONTAL WELLS | 2007 |
|
RU2344280C1 |
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSITS | 2008 |
|
RU2363839C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSITS | 2008 |
|
RU2398104C2 |
PROCEDURE FOR DEVELOPMENT OF DEPOSITS OF HIGH VISCOUS OIL AND BITUMEN BY MEANS OF WELLS WITH HORIZONTAL INCLINED SECTIONS | 2010 |
|
RU2431743C1 |
DEVELOPMENT METHOD OF DEPOSITS WITH HIGH-VISCOSITY OILS AND BITUMENS BY MEANS OF SYSTEM OF HORIZONTAL INCLINED WELLS | 2010 |
|
RU2446278C1 |
METHOD OF BITUMEN PRODUCTION FROM UNDERGROUND DEPOSIT | 2006 |
|
RU2334092C1 |
METHOD OF BITUMEN PRODUCTION FROM UNDERGROUND DEPOSIT | 2006 |
|
RU2334091C1 |
Authors
Dates
2004-10-10—Published
2003-04-29—Filed