FIELD: mining industry.
SUBSTANCE: method includes drilling wells in shelf rock formations, charging of these with explosive substance, detonating well charges, cutting working areas of shelves in downward direction, forming of non-active edge and transporting rock into inner dump onto pit bottom by gravitational delivery. After inner dump reaches height of working area cut at block, cutting of working area at inner dump is performed and it is connected to working area cut at block, block and inner dump are worked on together, and ceiling rock formations are transported under slope of inner dump. Calculation of inner dump height for each shelf is performed on basis of mathematical expression. With lowering of mining operations and increase of width of areas cut at inner dump, extraction of inner dump is performed partially: one portion is transported under slope of dump, and second portion is left at pit bottom, on slope of remaining dump a system of descents is formed and a bench for transporting ceiling rock formations. Minimal width of working areas cut at inner dump according to conditions for opening mineral resource are determined for each shelf down to pit bottom on basis of mathematical expression. Volume of ceiling rock formations remaining at pit bottom and not additionally transported is determined on basis of mathematical expression.
EFFECT: lower time and resources costs due to combination of working areas cut at block and inner dump.
2 dwg, 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMBINED EXTRACTION OF MINERAL RESOURCES IN EDGE-ADJACENT PIT AREA | 2003 |
|
RU2239061C1 |
OPENCAST WITH TWO CLOSELY LOCATED ORE BODIES DEVELOPMENT METHOD | 2008 |
|
RU2382200C1 |
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
METHOD OF OPENCAST MINING OF STEEP ELONGATED MINERAL DEPOSITS | 1999 |
|
RU2171377C2 |
PROCESS OF OPENCAST MINING OF STEEPLY DEEPING STRETCHED-OUT MINERAL DEPOSITS | 2002 |
|
RU2224109C2 |
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378512C1 |
METHOD OF OPEN MINING OF STEEP-DIPPING MINERAL DEPOSITS | 0 |
|
SU1761954A1 |
METHOD OF STRIP MINING OF STEEP DEPOSITS | 0 |
|
SU1155755A1 |
METHOD OF OPENCAST MINING OF STEEPLY DIPPING STRETCHED DEPOSITS | 1999 |
|
RU2167297C2 |
METHOD OF MINERAL OPENCAST MINING | 0 |
|
SU1730452A1 |
Authors
Dates
2004-10-27—Published
2003-03-24—Filed