FIELD: mining.
SUBSTANCE: invention relates to mining and can be used in quarry mining of minerals. Proposed method comprises preliminary determination of local extraction boundaries, cutting main cross-over into quarry from ground surface at preset distance from the line extraction bottom adjoins said cross-over on, forming unused branch of preset length and using temporary cross-over to end up with minerals extraction. Now preset-length cross-over branch is made to adjoin unused branch and designed cross-over, using destructed rocks, so that its links adjoin rotary platform. Proposed invention covers also analytical relations allowing determining move-down length and move-down branches, as well as boundaries of local extraction.
EFFECT: higher efficiency and yield, reduced costs.
7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINERALS QUARRY MINING | 2008 |
|
RU2378513C1 |
METHOD OF EXTRACTION OF MINERALS FROM OPEN-PIT FLANKS | 1995 |
|
RU2100608C1 |
DEVELOPMENT METHOD OF MINERAL RESOURCES BY SPIRAL PIT | 2010 |
|
RU2435032C1 |
METHOD FOR EXTRACTION OF BY-SLOPE MINERALS | 1994 |
|
RU2054120C1 |
METHOD OF EXTRACTING UNDEREXPLORED MINERAL FROM FLANKS OF OPENCAST | 1997 |
|
RU2122118C1 |
METHOD OF OPENCAST RECONSTRUCTION | 0 |
|
SU1710754A1 |
METHOD OF MINERAL EXTRACTION FROM FLANKS OF OPENCAST | 1995 |
|
RU2087716C1 |
METHOD FOR FINISHING OPEN-PITS | 1994 |
|
RU2077674C1 |
METHOD FOR WINNING MINERALS IN QUARRY SIDE | 1996 |
|
RU2114994C1 |
PROCEDURE FOR OPEN PIT DEVELOPMENT OF MINERAL DEPOSITS | 2009 |
|
RU2394158C1 |
Authors
Dates
2010-01-10—Published
2008-10-03—Filed