FIELD: building, particularly for construction and reconstruction of bridge, berth and parking traffic areas, aerodrome and road pavement built on soft grounds and floor structures for civil building.
SUBSTANCE: panel comprises upper and lower slabs and resilient partitioning layer. Upper slab includes three parts, namely peripheral strips located along lower slab perimeter and having widths of perpendicular strips of e1 and l1, inner strips forming net inside lower slab perimeter and having widths of perpendicular strips of b2 and l2 accordingly and main parts located inside net defined by peripheral and inner strips and having dimensions of b3 and l3. Main parts contact with lower slab through resilient partitioning layer. Peripheral and inner strips are fixedly connected to lower slab by vertical anchors. Main parts are connected with inner and peripheral strips by horizontal anchors. e1, l1, b2,l2,b3 and l3, are determined from given relations.
EFFECT: increased rigidity and bending strength due to provision of combined action of panel layers.
2 cl, 15 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRESTRESSING OF MULTIPLE-SPAN UNSPLITTABLE REINFORCED CONCRETE SLAB-TYPE SUPERSTRUCTURES OF BRIDGES | 1999 |
|
RU2149944C1 |
METHOD FOR PRESTRESSING OF SOLID REINFORCED - CONCRETE SLABBED DOUBLE-FRAMEWORK BRIDGES | 1999 |
|
RU2152476C1 |
METHOD FOR CYCLIC MOVEMENT OF SOLID REINFORCED CONCRETE BRIDGE SPAN IN LONGITUDINAL DIRECTION | 2004 |
|
RU2242559C1 |
FLOOR | 0 |
|
SU1791573A1 |
PRESTRESSED SOLID STEEL SPAN STRUCTURE OF A BRIDGE AND METHOD OF ITS MANUFACTURING | 2018 |
|
RU2701258C1 |
PROCESS OF LAYING CONCRETE ON MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURES EXTENDED IN AREA | 2001 |
|
RU2211892C2 |
STEEL REINFORCED CONCRETE BRIDGE SPAN AND METHOD OF ITS MAKING | 2011 |
|
RU2468143C2 |
METHOD FOR PRESTRESSING OF FRAMED REINFORCED CONCRETE SLAB-TYPE SUPERSTRUCTURES OF BRIDGES | 1999 |
|
RU2149236C1 |
METHOD FOR ERECTION OF MONOLITHIC MULTI-SPAN OVERLAPPING | 2019 |
|
RU2710229C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
Authors
Dates
2004-12-27—Published
2003-04-16—Filed