FIELD: oil and gas extractive industry.
SUBSTANCE: method includes oil extraction through horizontal slanting wells and pumping of working agent through vertical force wells, placed along one row system. Shafts of horizontal extracting wells are directed along row with slantingly directed opening of productive sub-layers in bed section, from ceiling to shoe. Number of vertical wells in force row, for one horizontal extracting well of calculated extraction element, is determined from calculation of one additional force well for value of shaft elongation of horizontal extracting well, which is determined from analytical expression.
EFFECT: higher oil yield.
7 cl, 1 ex, 3 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTION OF OIL DEPOSIT | 2003 |
|
RU2247828C2 |
METHOD OF DEVELOPMENT OF AN OIL POOL | 2002 |
|
RU2231631C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT | 2005 |
|
RU2291955C1 |
METHOD OF HYDROCARBON DEPOSIT DEVELOPMENT WITH PHYSICAL EFFECT ONTO GEOLOGICAL MEDIUM | 2007 |
|
RU2349741C2 |
METHOD OF IMPLEMENTATION OF VERTICAL WATER FLOODING OF OIL DEPOSIT | 2007 |
|
RU2342523C2 |
METHOD FOR DEVELOPMENT OF OIL POOL | 1990 |
|
SU1764352A1 |
METHOD FOR RECOVERY OF RESIDUAL OIL RESERVES | 2012 |
|
RU2511151C2 |
METHOD FOR DEVELOPMENT OF STRATIFIED OIL DEPOSITS | 2012 |
|
RU2513955C1 |
METHOD OF OIL POOL DEVELOPMENT | 2000 |
|
RU2193649C2 |
DEVELOPMENT METHOD OF FRACTURED HIGH-VISCOSITY OIL DEPOSIT | 2011 |
|
RU2483207C2 |
Authors
Dates
2004-12-27—Published
2002-12-16—Filed