METHOD FOR SCREW PILE DRIVING IN GROUND AND SCREW PILE DRIVEN BY ABOVE METHOD Russian patent published in 2005 - IPC

Abstract RU 2244065 C1

FIELD: building, particularly for building load-bearing foundations and securing different mechanisms and devices in ground, including permafrost ones, for driving metal tubular piles, preferably having diameters of 168 - 219 mm.

SUBSTANCE: method involves pressing pile in ground along with simultaneous driving thereof with the use of inner inventory key. Torque is initially applied to screw blade by inventory key and then as pile driving resistance increases pile shaft is also involved in torque transfer process, wherein exceeding of predetermined torque value to inventory key or pile shaft is not allowed. Screw pile comprises cylindrical tubular shaft with guiding cone, screw blade and seat formed in lower shaft part for inner inventory key installation. Shaft is formed of metal and has means for taking torque transferred from above key.

EFFECT: reduced material consumption due to providing two-stage torque transfer scheme, increased reliability of pile driving process and pile as a whole.

7 cl, 8 dwg

Similar patents RU2244065C1

Title Year Author Number
SCREW PILE AND PILE DRIVING METHOD 2005
  • Beljaev Vladimir Vladimirovich
  • Lobanov Sergej Vladimirovich
  • Lubjagin Aleksandr Vasil'Evich
  • Torbin Aleksandr Petrovich
  • Shumakov Igor' Konstantinovich
RU2305729C1
EXTENDABLE SCREW PILE AND METHOD FOR ITS ARRANGEMENT 2021
  • Maltsev Nikolaj Sergeevich
  • Dobrynskij Andrej Vladimirovich
  • Chistyakov Dmitrij Yurevich
RU2769003C1
METHOD OF CONSTRUCTING SECTIONIZED HOLLOW SCREW PILE 0
  • Rubinshtejn Abram Borisovich
  • Zhabrov Dmitrij Ivanovich
  • Zakharova Irina Mironovna
  • Kolomenskij Viktor Filippovich
SU987031A1
TELESCOPIC SCREW PILE WITH LEADER PILE 2021
  • Maltsev Nikolaj Sergeevich
  • Dobrynskij Andrej Vladimirovich
  • Chistyakov Dmitrij Yurevich
RU2763573C1
SCREW PILE 0
  • Glushkov Vladimir Petrovich
  • Laptev Ivan Ivanovich
  • Vershinin Stanislav Aleksandrovich
  • Mirzoev Dilizhan Allakhverdievich
SU1761870A1
METHOD FOR INSTALLATION OF SCREW PILE IN PERMAFROST SOILS AND HELICAL SCREW FOR IMPLEMENTATION OF METHOD 2022
  • Alekseev Andrei Grigorevich
  • Zvezdov Anton Andreevich
  • Zorin Dmitrii Vasilevich
RU2786081C1
SCREW PILE 2007
  • Romakin Nikolaj Egorovich
  • Romakin Dmitrij Nikolaevich
  • Maksimov Valerij Pavlovich
RU2341620C1
SCREW PILE 2014
  • Zubekhin Sergej Alekseevich
RU2564714C1
BORING PILE 0
  • Pchelin Vyacheslav Nikolaevich
  • Chernyuk Vladimir Petrovich
  • Dzibuk Anatolij Danilovich
SU870586A1
SCREW PILE 2018
  • Barashev Matvej Nesterovich
RU2685519C1

RU 2 244 065 C1

Authors

Lobanov S.V.

Kurakin B.M.

Dates

2005-01-10Published

2003-05-20Filed