FIELD: nuclear power engineering; manufacture of fuel elements and their claddings.
SUBSTANCE: each weld of cladding and its plug are tested in facility equipped with units for clamping and revolving the claddings, scanning with carriage using weld inspection piezoelectric transducer and piezoelectric transducer for measuring wall thickness in measurement region, immersion bath, ultrasonic pulse generator, ultrasonic pulse receiver, microprocessor, analog-to-digital converter switch, and random-access memory.
EFFECT: enhanced quality of fuel elements and their operating reliability in reactor core.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS | 1999 |
|
RU2155395C1 |
PROCESS LINE FOR FUEL ELEMENT MANUFACTURE | 2003 |
|
RU2256250C2 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS AND INSPECTING THEM FOR QUALITY | 2001 |
|
RU2216058C2 |
AUTOMATIC TRANSFER LINE FOR MANUFACTURING FUEL ELEMENTS AND REJECTING DEFECTIVE ONES | 1995 |
|
RU2107960C1 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS | 1997 |
|
RU2145449C1 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS | 2001 |
|
RU2216801C2 |
AUTOMATIC TRANSFER LINE FOR MANUFACTURING FUEL-ELEMENT CANS | 2000 |
|
RU2195723C2 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENT CLADDING | 1999 |
|
RU2170463C2 |
AUTOMATIC LINE FOR MANUFACTURE OF NUCLEAR REACTOR FUEL ELEMENT CLADDINGS | 2006 |
|
RU2338277C2 |
METHOD AND PROCESS LINE FOR MANUFACTURING FUEL ELEMENT CLADDING | 1994 |
|
RU2084026C1 |
Authors
Dates
2005-01-10—Published
2003-02-21—Filed