FIELD: oil and gas extractive industry.
SUBSTANCE: method includes lowering and mounting tubing string with packer in a well. Fracturing liquid is pumped into tubing string with certain speed and pressure, and hydro-impacts are formed. Before fracturing liquid a deep secondary opening of high-productive bed portion is performed. Column of tubing pipes with tail piece and cone in lower part is performed. Resilient-viscous compound is pumped into well and pushed to position of formed cracks. Fracturing liquid is forced into tubing pipe, while at starting period - at increased speed. Hydraulic impacts are formed by stopping fracturing liquid flow from the surface, and through same well bed products are extracted.
EFFECT: higher oil yield.
1 ex, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS AND GEAR FOR DEVELOPMENT AND CLEARING OF FACE ZONE OF WELLS BY PULSE DRAINAGE | 1999 |
|
RU2159326C1 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
TREATMENT METHOD OF BOREHOLE ZONE OF LOW-PERMEABLE BED AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2703093C2 |
PRODUCTION BED TREATMENT METHOD | 2004 |
|
RU2258803C1 |
WELL BORE ZONE TREATMENT METHOD | 2004 |
|
RU2276722C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION | 2007 |
|
RU2376453C2 |
PHYSICAL EFFECT METHOD USED DURING DEVELOPMENT OF HYDROCARBON DEPOSIT, AND BORE-HOLE PLANT FOR METHOD'S REALISATION | 2007 |
|
RU2366806C1 |
METHOD FOR TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND DEVICE FOR ITS REALIZATION | 1989 |
|
SU1739699A1 |
METHOD FOR TREATMENT OF WELL-ADJACENT BED ZONE | 2003 |
|
RU2241828C2 |
METHOD AND DEVICE FOR WELL BOTTOM ZONE DEVELOPMENT AND CLEANING BY IMPULSE DRAINAGE | 2004 |
|
RU2272902C1 |
Authors
Dates
2005-01-20—Published
2003-10-01—Filed