PHYSICAL EFFECT METHOD USED DURING DEVELOPMENT OF HYDROCARBON DEPOSIT, AND BORE-HOLE PLANT FOR METHOD'S REALISATION Russian patent published in 2009 - IPC E21B43/16 

Abstract RU 2366806 C1

FIELD: mining.

SUBSTANCE: group of inventions can be used in mining industry when developing hydrocarbon deposits. Method involves extraction of formation fluid through production wells, action on formations with wave radiations and depression-repression excitations of formation pressure from at least one production and/or injection well, determination of influencing frequencies and control of well formation fluid extraction. According to the invention, during depression-repression excitation of formation pressure from the wells there pre-tested is the formation by recording and analysing signals of its ambient seismic noise according to which and according to hydrodynamic parametres of the formation and composition of the formation fluid there determined are frequency ranges and modes of effective influence, which provide increase of average daily production of oil, decrease of its watercut, decrease of coefficient of suspended particles in produced oil and increase of coefficient of its light absorption. Then there carried out is poly-frequency effect with determined parametres by using simultaneous operation of at least two sources. Depression-repression excitation with the above testing is performed from time to time simultaneously or alternately with poly-frequency effect, and in the formation feedback mode there corrected are effect modes by specifying frequency ranges and by combining radiation sources. Effect is repeated in cycles until the change of formation fluid extraction is stopped. The plant includes a column of oil-well tubing, two tube parts connected to each other, one of which is equipped with mechanical stress concentrator and is fixed, and the other tube part is equipped with a piston and installed with the possibility of back-and-forth movement relative to the fixed tube part. Tube parts are connected coaxially. At that, the fixed tube part is located inside, and consists of at least two in-series connected hollow cylinders of various diametre; at least one of which is equipped with the relay valve that hydraulically connects the cylinder cavity to the well space, and the other one is equipped with a flow control. At that, coaxially connected tube parts are equipped with a water seal, which are installed on in-series connected hollow cylinders of various diametre and connected to the well space and to the inner cavity of the tube part equipped with a piston and, in addition, with a relay valve control drive.

EFFECT: increasing effectiveness of the invention owing to the effect on the formation with physical wave radiations and use of formation self-energy and deposit potential.

25 cl, 2 ex, 7 dwg

Similar patents RU2366806C1

Title Year Author Number
METHOD FOR HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION 2012
  • Dyblenko Valerij Petrovich
  • Kuznetsov Oleg Leonidovich
  • Pankratov Evgenij Mikhajlovich
  • Chirkin Igor Alekseevich
  • Sharifullin Rishad Jakhievich
RU2584191C2
DOWNHOLE EQUIPMENT FOR POLYFREQUENCY WAVE TREATMENT OF BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION AND FLOWRATE OSCILLATIONS GENERATOR FOR THAT 2014
  • Dyblenko Valerij Petrovich
  • Tufanov Il'Ja Aleksandrovich
  • Marchukov Evgenij Juvenal'Evich
RU2574651C1
PRODUCTION BED TREATMENT METHOD 2004
  • Dyblenko V.P.
  • Tufanov I.A.
RU2258803C1
OIL DEPOSIT DEVELOPMENT METHOD 2012
  • Dyblenko Valerij Petrovich
  • Kuznetsov Oleg Leonidovich
  • Chirkin Igor' Alekseevich
  • Sharifullin Rishad Jakhievich
RU2526922C2
METHOD FOR EXTRACTING HYDROCARBON DEPOSITS INCLUDING COMPLEX PHYSICAL BED STIMULATION 2004
  • Dyblenko Valerij Petrovich
  • Sharifullin Rishad Jakhievich
  • Tufanov Il'Ja Aleksandrovich
  • Pankratov Evgenij Mikhajlovich
RU2291954C2
TREATMENT METHOD OF PRODUCTIVE FORMATION, AND DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION 2010
  • Dyblenko Valerij Petrovich
  • Kuznetsov Oleg Leonidovich
  • Manyrin Vjacheslav Nikolaevich
  • Eremenko Jurij Vasil'Evich
  • Sharifullin Rishad Jakhievich
  • Sufijarov Mars Magrufovich
RU2478778C2
OIL PRODUCTION METHOD WITH FORCE APPLICATION TO RESERVOIR AND DOWNHOLE EQUIPMENT FOR ABOVE METHOD REALIZATION 2004
  • Dyblenko Valerij Petrovich
  • Marchukov Evgenij Juvenal'Evich
  • Lysenkov Aleksandr Petrovich
  • Sharifullin Rishad Jakhievich
  • Tufanov Il'Ja Aleksandrovich
  • Belobokov Dmitrij Mikhajlovich
RU2285788C2
METHOD OF DEVELOPMENT OF MINERAL DEPOSITS EXTRACTED THROUGH WELLS 2007
  • Dyblenko Valerij Petrovich
  • Kuznetsov Oleg Leonidovich
  • Chirkin Igor' Alekseevich
  • Rogotskij Gennadij Viktorovich
  • Ashchepkov Jurij Sergeevich
  • Sharifullin Rishad Jakhievich
RU2357073C2
METHOD OF HYDROCARBON DEPOSIT DEVELOPMENT WITH PHYSICAL EFFECT ONTO GEOLOGICAL MEDIUM 2007
  • Dyblenko Valerij Petrovich
  • Evchenko Viktor Semenovich
RU2349741C2
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION 2007
  • Boguslaev Vjacheslav Aleksandrovich
  • Kononenko Petr Ivanovich
  • Skachedub Anatolij Alekseevich
  • Kvitchuk Kim Kirillovich
  • Kozlov Oleg Viktorovich
  • Slidenko Viktor Mikhajlovich
  • Listovshchik Leonid Konstantinovich
  • Lesik Vasilij Sergeevich
RU2376453C2

RU 2 366 806 C1

Authors

Dyblenko Valerij Petrovich

Lysenkov Aleksandr Petrovich

Ashchepkov Jurij Sergeevich

Luk'Janov Jurij Viktorovich

Belobokov Dmitrij Mikhajlovich

Dates

2009-09-10Published

2007-12-28Filed