FIELD: land-reclamation, particularly drainage building in flooded irrigated lands.
SUBSTANCE: method involves digging out channel in a single drainage machine pass by plow-type ditcher; dumping dug out fertile ground on channel brows in banks; digging out trench by operative tool of drainage machine; laying drainage pipe and covering thereof with ground; filling channel with fertile ground. Fertile ground layer is loosened before trench digging out along drainage pipe laying axis, wherein width of loosened ground strip is not less than operative tool width. Loosened ground is laid on channel brows. Trench is dug out by chain operative tool of narrow drainage machine performing reverse rotation and extracted ground is placed between trench walls and drainage machine bunker to cover drainage pipe moved into trench by guiding means. Trench is backfilled with ground with the use of two pairs of banks, which provides successive filling trench with ground and loosened fertile ground.
EFFECT: increased efficiency due to prevention of trench wall compaction, reduced power inputs.
7 dwg
Authors
Dates
2005-02-27—Published
2002-02-06—Filed