FIELD: land reclamation, particularly to lay drain collection system in zones having ground water level above drainage laying level.
SUBSTANCE: method involves loosening fertile ground layer along drain laying axis; digging out channel; forming kerbs of excavated fertile ground; developing trench with chain working tool performing reverse rotation without ground lifting to surface; laying drainage pipe; backfilling the trench and the channel. Pulp consisted of crashed ground and water is extracted from lower trench part during drainage laying and the extracted pulp is supplied into channel or to surface of material used for trench backfilling. Device comprises basic machine, active working tool rotated in reverse direction, drainage pipe tray, box-like hopper with front cutting part, namely knife including post and plowshare. Suction dredge is installed inside the plowshare. Suction dredge has suction line communicated with zone between active working tool and knife through windows formed in front plowshare section. Pressure supply pipeline is communicated with distribution pipelines through intermediate pipeline and bypass gate operated by lever mechanism.
EFFECT: increased productivity and quality of drainage laying in water-saturated ground.
2 cl, 2 dwg
Authors
Dates
2006-04-20—Published
2004-12-08—Filed