FIELD: construction.
SUBSTANCE: method comprises trenching, laying pipeline in the trench, covering the pipeline with a material for reducing the friction of pipeline, and filling the trench with soil. The covering is made of flexible porous material preliminary impregnated with carbamide-formaldehyde resin. The space is provided between the outer surface of the pipeline and inner surface of the trench.
EFFECT: enhanced reliability.
4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR LAYING UNDERGROUND PIPELINE IN ZONES OF HIGHER SEISMICITY | 2009 |
|
RU2413894C2 |
METHOD OF PROTECTING UNDERGROUND PIPELINES IN SEISMICALLY-ACTIVE ZONES | 2004 |
|
RU2251043C1 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
METHOD TO INSTALL UNDERGROUND PIPELINE WHEN CROSSING ACTIVE SEISMOTECTONIC AREA | 2012 |
|
RU2509249C2 |
METHOD OF AND DEVICE FOR PREVENTING WASHOUT OF SOIL COVERING PIPELINE IN DITCHES ON SLOPES | 2002 |
|
RU2218505C1 |
METHOD OF LAYING PIPE LINES (VERSIONS) AND DEVICE FOR REALIZATION OF THIS METHOD | 2004 |
|
RU2244191C1 |
METHOD AND DEVICE FOR LAYING PIPELINE | 2005 |
|
RU2274793C1 |
METHOD OF LAYING UNDERGROUND PIPELINE IN SETTLEMENT SOILS (VERSIONS) | 2004 |
|
RU2249144C1 |
METHOD OF BUILDING TECHNOLOGICAL CROSSING OVER OBSTACLE (VERSIONS) | 2003 |
|
RU2221954C1 |
METHOD TO INSTALL PIPELINES IN SEISMIC REGIONS | 2010 |
|
RU2447348C2 |
Authors
Dates
2005-04-20—Published
2004-06-22—Filed