FIELD: materials handling facilities; railway transport.
SUBSTANCE: charging of several similar accumulating cars 1 connected into one freight train 15, each provided with bottom belt conveyor 6 and reloading belt conveyor 10 is carried out automatically. For this purpose speed of bottom belt conveyor 6 belonging to accumulating car 1 under accumulating conditions S is adjusted depending on amount of dropped down loose material 16 recorded in process of measuring of rear end of accumulating car 1 under accumulating conditions S to provide filling of car at maximum height of loading (hmax).
EFFECT: provision of automatic filling of freight train car.
5 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
ACCUMULATING CAR WITH MEASURING DEVICE | 2003 |
|
RU2250945C2 |
FREIGHT CAR FOR LOOSE CARGOES | 2001 |
|
RU2185981C1 |
METHOD OF LOADING AND UNLOADING OF FREIGHT CAR AND CAR USED AT THIS METHOD | 2000 |
|
RU2186017C2 |
METHOD FOR CONTROLLING BALLAST SUPPLY DURING RENOVATION OF BALLAST BED | 2015 |
|
RU2665996C2 |
METHOD OF LOADING RAILWAY VEHICLE AND RAILWAY VEHICLE | 2015 |
|
RU2674898C2 |
CAR FOR TRANSPORTING LOOSE MATERIALS | 2001 |
|
RU2202425C2 |
LOAD PLATFORM FOR LOOSE LOADS | 1997 |
|
RU2151075C1 |
TRACK MACHINE | 2002 |
|
RU2246568C2 |
FREIGHT CAR FOR BULK MATERIAL | 1998 |
|
RU2137696C1 |
LOOSE LOAD PLATFORM | 1997 |
|
RU2135381C1 |
Authors
Dates
2005-07-10—Published
2003-07-23—Filed