FIELD: construction.
SUBSTANCE: invention relates to railway construction and is intended for renovation of a ballast bed of a track. During renovation of a ballast bed of a track, old bulk material is removed and stored on a number of storage wagons. New bulk material is introduced, which is pre-stored on a number of storage wagons. Processes of removing the old bulk material and filling up new bulk material is carried out concurrently. Adjustment of the amount of new bulk material is carried out automatically depending on the volume of the removed old bulk material.
EFFECT: higher efficiency of work on renovation of a ballast bed of a track.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LOADING RAILWAY VEHICLE AND RAILWAY VEHICLE | 2015 |
|
RU2674898C2 |
ACCUMULATING CAR WITH MEASURING DEVICE | 2003 |
|
RU2250945C2 |
FREIGHT TRAIN LOADING METHOD | 2003 |
|
RU2256021C2 |
METHOD OF LOADING AND UNLOADING OF FREIGHT CAR AND CAR USED AT THIS METHOD | 2000 |
|
RU2186017C2 |
RAIL TRACK REPAIR MACHINE | 2001 |
|
RU2228983C2 |
BALLAST SPREADING MACHINE AND METHOD OF TRACK BALLASTING | 1998 |
|
RU2150545C1 |
FREIGHT CAR FOR LOOSE CARGOES | 2001 |
|
RU2185981C1 |
LOAD PLATFORM FOR LOOSE LOADS | 1997 |
|
RU2151075C1 |
MACHINE FOR AND METHOD OF REMOVING OLD AND LAYING NEW RAIL TRACK | 2001 |
|
RU2207423C2 |
LOOSE LOAD PLATFORM | 1997 |
|
RU2135381C1 |
Authors
Dates
2018-09-05—Published
2015-02-24—Filed