FIELD: oil industry.
SUBSTANCE: method includes washing tubing pipes using solvent - condensed light hydrocarbons, produced using centrifugal forces of hydraulic cyclone, with insertion of it through behind-pipe space into said tubing columns and circulation with down-pump operating in towards-self mode. Said solvent contains admixture in form of special surfactant, washing is performed at temperature close to temperature of melting of paraffin with loss of said solvent 5-10 m3 in one well.
EFFECT: higher efficiency, broader functional capabilities.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCTION OF REAGENT FOR REMOVAL OF ASPHALTENE-RESINOUS-WAX ACCUMULATIONS | 1989 |
|
SU1832714A1 |
WELL BOTTOM HOLE TREATMENT METHOD | 2002 |
|
RU2224089C1 |
WELL BOTTOMHOLE ZONE TREATMENT METHOD FOR WASHING PARAFFIN ASPHALT AND TERRY MATTERS | 2017 |
|
RU2652236C1 |
METHOD OF SYNERGETIC REACTANT-IMPULSE-WAVE TREATMENT OF BOTTOM-HOLE FORMATION ZONE AND PLANT FOR ITS IMPLEMENTATION | 2010 |
|
RU2462586C2 |
METHOD FOR REMOVING ASPHALTENORESINPARAFFIN DEPOSITION FROM EQUIPMENT IN WELLS | 1998 |
|
RU2129651C1 |
METHOD OF REMOVING PARAFFIN DEPOSITS | 2015 |
|
RU2584172C1 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION | 2007 |
|
RU2376453C2 |
METHOD OF CONTROLLING FORMATION OF ASPHALTENE SEDIMENTS DURING PRODUCTION OF HIGH POUR POINT ANOMALOUS OIL | 2021 |
|
RU2766996C1 |
METHOD FOR ASPHALT-TAR-PARAFFIN DEPOSITS PREVENTION IN OIL PRODUCTION EQUIPMENT | 2005 |
|
RU2298642C1 |
METHOD FOR ASSESSMENT AND SELECTION OF EFFECTIVE SOLVENTS FOR DEPOSITS OF PARAFFIN TYPE | 2013 |
|
RU2542017C1 |
Authors
Dates
2005-07-10—Published
2003-10-27—Filed