FIELD: oil production, particularly methods or apparatus for cleaning boreholes or wells.
SUBSTANCE: method involves lowering production strings with protective coatings preliminarily applied thereto in wells; creating protective coatings in flow lines extending from well. Two part production strings previously covered with heat-protective substance from inner and outer sides thereof are lowered in well. The protective substance includes hollow microspheres. Production string with 5-15 dried or hardened heat-protective layers is lowered under dynamic level of liquid in well. Production string with 2-3 heat-protective layers is lowered over dynamic level of liquid in well. Produced liquid temperature is maintained at level of not less than paraffin melting temperature through interval extending to at least production string top, accessible for asphalt-tar-paraffin deposit removal by thermal methods with the use of heat-carrying agent by increasing number of layers and total heat-protective coating thickness. As asphalt-tar-paraffin deposit layer grows the deposits are removed by thermal and/or chemical methods with the use of processing liquid.
EFFECT: increased efficiency of asphalt-tar-paraffin deposits prevention due to decreased produced oil cooling and provision of guaranteed asphalt-tar-paraffin deposits removal by heat and/or chemical methods with the use of thermal and/or chemical agent, extended field of protective coating usage.
2 cl, 4 dwg, 2 ex
Title | Year | Author | Number |
---|---|---|---|
WELL COMPLETION METHOD | 2005 |
|
RU2304697C1 |
METHOD FOR CONTROLLNG ASPHALT-RESIN-PARAFFIN DEPOSITS IN OILFIELD EQUIPMENT | 2021 |
|
RU2779242C1 |
METHOD OF CONTROLLING FORMATION OF ASPHALTENE SEDIMENTS DURING PRODUCTION OF HIGH POUR POINT ANOMALOUS OIL | 2021 |
|
RU2766996C1 |
METHOD FOR CONTROL OF ASPHALT-RESIN-PARAFFIN DEPOSITS FORMATION IN LIFT PIPES DURING GASLIFT OPERATION OF WELLS | 2021 |
|
RU2755778C1 |
METHOD FOR PREVENTING FORMATION OF ASPHALT, RESIN AND PARAFFIN DEPOSITS | 2023 |
|
RU2808077C1 |
COMBINED METHOD FOR TUBING CLEANING AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2627520C1 |
METHOD FOR PREVENTING DEPOSITS OF ASPHALT-RESINS AND PARAFFIN COMPONENTS OF OIL IN PUMP COMPRESSOR TUBES IN THE WELL AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2661951C1 |
COMPOSITION FOR REMOVING OF PARAFFIN HYDRATE AND/OR ASPHALTENE RESIN PARAFFIN DEPOSITIONS AND METHOD FOR ITS REALIZATION | 1995 |
|
RU2073696C1 |
METHOD FOR CLEANING A DOWNHOLE ROD PUMPING UNIT FROM ASPHALTENE-RESIN-PARAFFIN DEPOSITS WHEN A STRING OF SUCKER RODS HANGS | 2022 |
|
RU2780058C1 |
DEVICE FOR REMOVING ASPHALTENE-RESIN-PARAFFIN AND/OR PARAFFIN-HYDRATE DEPOSITIONS | 1996 |
|
RU2116434C1 |
Authors
Dates
2007-05-10—Published
2005-09-14—Filed