FIELD: rolled tube production.
SUBSTANCE: method comprises steps of heating ingot-billets; piercing them in helical rolling mill to sleeves with different lengthwise elongation factors μpr and μpr1; rolling in pilger mill with elongation factor μpil . Ingot-billets are pierced to sleeves at different lengthwise elongation factors μpr, μpr1, μpr2 where maximum elongation value μpr2 corresponds to front end of sleeve forming guided end of tube in pilger mill. Elongation factor of front end of sleeve is decreased from μpr2 to μpr due to drawing roll apart along length (0.15 -0.20)LT forming guided end of tube in pilger mill and determined according to expression μpr2 = (1.4 -1.6)μpr where μpr -elongation factor in piercing mill at stable rolling process of central portion of sleeve equal to (0.65 -0.75)LT. Elongation factor of back end of sleeve is increased from μpr to μpr1 due to drawing rolls together along length of sleeve equal to (0.1 - 0.15)LT forming pilger head determined according to expression μpr1 = (1.3 -1.5)μpr.
EFFECT: lowered metal consumption, enhanced efficiency of pilger mills, prevention of crumbling back ends of sleeves.
3 cl, 1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
PRODUCTION OF SEAMLESS HOT-ROLLED PIPES AT PRU WITH PILGER MILL | 2012 |
|
RU2522508C1 |
METHOD FOR MAKING SEAMLESS HOT ROLLED TUBES IN TUBE ROLLING AGGREGATES WITH PILGER MILLS | 2004 |
|
RU2271886C2 |
PRODUCTION OF SEAMLESS HOT-ROLLED PIPES AT PRU WITH PILGER MILLS | 2013 |
|
RU2523385C1 |
METHOD FOR MAKING SEAMLESS HOT ROLLED LARGE-DIAMETER TUBES AT HIGH ACCURACY OF WALL IN TUBE ROLLING LINES WITH PILGER MILLS | 2001 |
|
RU2207200C2 |
METHOD FOR MANUFACTURE OF SEAMLESS HOT ROLLED TUBES | 2002 |
|
RU2238811C2 |
SEAMLESS HOT ROLLED TUBE MANUFACTURING METHOD | 2002 |
|
RU2233720C2 |
METHOD OF CONVERSION PIPE MANUFACTURING IN PIPE ROLLING PLANTS WITH PILGER MILLS OF LOW-ELASTICITY STEEL WITH BORON CONTENT OF 1,3-1,8% | 2006 |
|
RU2334571C2 |
FABRICATION METHOD OF SEAMLESS HOT-DEFORMED TUBES OF LARGE AND MEAN DIAMETRES FROM DIFFICULT-TO-FORM GRADES OF STEEL AND ALLOYS ON TUBE-FORMING INSTALLATION WITH PILGER MILLS | 2008 |
|
RU2387497C2 |
METHOD FOR PRODUCING HOT ROLLED CONVERSION LARGE- AND MEAN-DIAMETER TUBES OF HARD-TO-FORM STEELS AND ALLOYS IN TUBE ROLLING PLANTS WITH PILGER MILLS | 2004 |
|
RU2278750C2 |
METHOD FOR MAKING HOT-DEFORMED SEAMLESS LARGE-DIAMETER TUBES | 2003 |
|
RU2243837C1 |
Authors
Dates
2005-09-27—Published
2003-12-30—Filed