FIELD: rolled tube production processes and equipment, namely manufacture of seamless hot deformed tubes in tube rolling aggregates with pilger mills.
SUBSTANCE: method comprises steps of heating ingots and billets till yielding temperature; piercing them to sleeves in screw rolling mills; rolling sleeves to tubes in pilger mills between rolls with periodic profile and with cross outlet angle 20-25° at tilting sleeve-tubes. In pilger mills tubes are rolled at tilting them by 70±2° or 110±2°.
EFFECT: enhanced quality of tubes due to lowered wall thickness difference, improved efficiency of pilger mills, reduced cost of ingot- tube conversion process.
1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ROLLING SEAMLESS HOT ROLLED CASING TUBES WITH BUTTRESS THREAD | 2005 |
|
RU2311239C2 |
MANUFACTURING METHOD OF SEAMLESS HOT-ROLLED CASING PIPES WITH DIMENSIONS OF 508×11,1, 508×12,7 AND 508×16,1 mm ON TPU 8-16" PIPE ROLLING UNIT WITH PILGER MILLS IN STANDARD AND COLD-RESISTANT CONFIGURATIONS | 2013 |
|
RU2545957C2 |
PRODUCTION OF SEAMLESS COLD-RESISTANT AND NONCORROSIVE 377×9-16 AND 426×9-18 mm PIPES AT PRU 8-16 WITH PILGER MILLS WITH STRINGENT REQUIREMENTS TO CURVATURE | 2013 |
|
RU2542150C2 |
METHOD FOR PRODUCTION OF SEAMLESS HOT-ROLLED CASING PIPES WITH DIAMETRE OF 508 MM AT TUBE-ROLLING PLANT 8-16" WITH PILGER MILLS IN ORDINARY AND COLD-RESISTANT VERSIONS | 2007 |
|
RU2386501C2 |
METHOD OF FABRICATION OF SEAMLESS HOT-ROLLED MACHINED PIPES WITH EXTENDED PRECISION SIZE 530(16 MM FROM STEEL GRADE "08X18H10T" FOR NUCLEAR POWER FACILITIES | 2013 |
|
RU2553729C1 |
METHOD FOR MAKING SEAMLESS HOT ROLLED TUBES IN TUBE ROLLING AGGREGATES WITH PILGER MILLS | 2003 |
|
RU2261151C1 |
PRODUCTION OF 426×90 MM SEAMLESS HOT-ROLLED PIPES FOR STEAM BOILERS, STEAM PIPELINES AND MANIFOLDS OF PLANTS WITH HIGH AND SUPERHIGH STEAM PARAMETERS OF "10Х9МФБ-Ш"-GRADE STEEL AT PRU 8-16'' WITH PILGER MILLS | 2013 |
|
RU2537639C1 |
METHOD FOR MAKING SEAMLESS HOT ROLLED CONVERSION ELONGATED TUBES OF HARD-TO-FORM KINDS OF STEELS AND ALLOYS | 2001 |
|
RU2226132C2 |
METHOD FOR PREPARING AND CALIBRATING ROLLS OF PILGER MILL | 2004 |
|
RU2288060C2 |
METHOD OF PRODUCTION OF SEAMLESS HOT-ROLLED LARGE- AND MEDIUM-DIAMETER PIPES FROM STEEL AND ALLOYS AT PIPE ROLLING PLANTS WITH PILGRIM MILLS FROM TUBULAR BLANKS | 2012 |
|
RU2502570C1 |
Authors
Dates
2006-03-20—Published
2004-06-02—Filed