FIELD: construction, particularly to erect multistory buildings, bridges with long spans, subways and other structures.
SUBSTANCE: method involves supplying concrete mix through concrete mix pipe into vertical tube; compacting the mixture by applying vibration, wherein the vibration is applied to concrete mix by concrete mix pipe tip along with moving the concrete mix pipe tip from lower tube base to upper part thereof at speed of 1-5 cm/s. Device for tube-cased concrete production comprises concrete mix pipe formed as high-pressure sleeve with steel tip. Steel tip is provided with vibrator arranged in upper part thereof and with tore-shaped rubber pressure chamber. Pressure chamber diameter is 0.5-0.9 of inner diameter of tube to be filled with concrete mix, height thereof is 0.1-0.4 of inner tube diameter. Pressure chamber is arranged under vibrator and snugly fits over tip body. Lower tip part has head. The tip is made as cylinder with inner diameter equal to 0.1-0.5 inner diameter of the tube and with length equal to 5-15 inner tube diameters. The head is made as steel cylinder with ribs formed on inner side surface. The ribs engage longitudinal guides of the tip in lower part thereof. Rests are formed on rib ends in upper head part. Head height is 0.1-0.3 of tip height, outer diameter thereof is 1.3-1.7 of outer tip diameter.
EFFECT: increased quality and speed or building frame erection.
2 cl, 1 dwg, 3 ex
Title | Year | Author | Number |
---|---|---|---|
LONG-DIMENSIONAL PIPE CONCRETE ELEMENT | 2017 |
|
RU2641142C1 |
UNIT FOR INTERFACING PIPE CONCRETE PILLARS-COLUMNS WITH SUPPORT BEAMS (EMBODIMENTS) | 2019 |
|
RU2716751C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
AUTOMATED METHOD TO ERECT STRUCTURE FRAME | 2011 |
|
RU2495987C2 |
METHOD TO MANUFACTURE GUNCRETE ELEMENTS OF STEEL DOUBLE-BRANCH PILLAR | 2011 |
|
RU2477773C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
METHOD OF ARRANGING DRIVEN PILE | 2017 |
|
RU2640467C1 |
METHOD OF TUNNEL TYPE POURED-IN-PLACE STRUCTURE CONCRETING IN ENLARGED BLOCKS WITH STEP-IN-STEP STRUCTURE COMPONENT ERECTION IN TOP-BOTTOM DIRECTION | 2003 |
|
RU2246588C1 |
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST | 2012 |
|
RU2513574C2 |
METHOD TO CONNECT GUNCRETE PILLARS AT HEIGHT AND SLABS | 2011 |
|
RU2464389C2 |
Authors
Dates
2005-10-20—Published
2003-06-18—Filed