METHOD OF ARRANGING DRIVEN PILE Russian patent published in 2018 - IPC E02D5/60 

Abstract RU 2640467 C1

FIELD: construction.

SUBSTANCE: method of arranging driven pile, in which a well informed by dipping into the ground of the casing string with a closed lower end to the spreading base layer of soil, fill the casing string with tight or loose material, remove the casing string, generate a broadened base in support of the base layer of soil, immerse the reinforced concrete pile with the penetration of its end into the broadened base. To form the well, a casing string with a self-opening tip is used, the immersion of which is carried out with penetration into the spreading base layer of soil. Filling the casing string is first carried out with a rigid ground material or a rigid concrete mix, and then with loose or rigid ground material. The non-extractable shell-tube, equipped with a rim-nozzle on its lower end, with its penetration into the bearing layer of soil, is penetrated into the ground outside the casing string coaxially with it. When removing the casing string with a self-extracting tip, the shell-tube is simultaneously filled with filling material located in the casing string, followed by immersion of the reinforced concrete pile into the filled shell-tube up and forming a broadened base and enlarged compacted area in base layer of soil in and with increasing density of filling material within the lateral surface of the submerged pile.

EFFECT: increased bearing capacity of pile and pile foundation, reliability of its construction, expansion of the field of application on ground conditions, increased efficiency as a whole.

3 cl, 5 dwg

Similar patents RU2640467C1

Title Year Author Number
PILE IN THE PUNCHED WELL ARRANGEMENT METHOD (EMBODIMENTS) 2017
  • Krutov Vladimir Ivanovich
  • Kovalev Aleksandr Semenovich
  • Kovalev Vladimir Aleksandrovich
RU2663420C1
METHOD OF ARRANGEMENT OF DRIVEN PILE IN A WELL WITH AN EXTENDED BASE 2018
  • Krutov Vladimir Ivanovich
  • Kovalev Aleksandr Semenovich
  • Kovalev Vladimir Aleksandrovich
RU2678172C1
INSTALLATION METHOD FOR A DRIVING PILE IN A PERFORATED MANTLE PIPE 2019
  • Kovalev Vladimir Aleksandrovich
RU2713822C1
METHOD OF PILE DRIVE DEVICE 2014
  • Krutov Vladimir Ivanovich
  • Kovalev Aleksandr Semenovich
  • Kovalev Vladimir Aleksandrovich
RU2601630C2
METHOD OF ARRANGING DRIVEN PILE IN PUNCHED WELL IN WEAK WATER-SATURATED SOILS (VERSIONS) 2016
  • Krutov Vladimir Ivanovich
  • Kovalev Aleksandr Semenovich
  • Kovalev Vladimir Aleksandrovich
RU2634912C1
DRIVING METHOD OF DRIVEN HOLLOW PILE WITH A WIDENED BASE 2018
  • Kovalev Vladimir Aleksandrovich
  • Kovalev Aleksandr Semenovich
RU2685719C1
DRIVE PILE DEVICE IN PUNCHED WELL WITH WIDER BASE 2014
  • Krutov Vladimir Ivanovich
  • Kovalev Aleksandr Semenovich
  • Kovalev Vladimir Aleksandrovich
RU2582530C2
TEST METHOD OF HOLLOW DRIVEN PILE WITH A WIDENED BASE 2019
  • Kovalev Vladimir Aleksandrovich
RU2717297C1
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION 2011
  • Akatov Vjacheslav Pavlovich
  • Akatov Maksim Vjacheslavovich
  • Dankovtsev Aleksandr Fedorovich
  • Pudeev Pavel Vasil'Evich
  • Smirnov Aleksandr Jur'Evich
  • Politiko Dmitrij Leonidovich
  • Fedorashko Nikolaj Vasil'Evich
RU2492294C1
"KVASHA" PILE AND METHOD FOR DEEPENING IN SOIL 1991
  • Kvasha Aleksandr Davydovich
  • Abbasov Pulat Abbasovich
RU2047689C1

RU 2 640 467 C1

Authors

Krutov Vladimir Ivanovich

Kovalev Aleksandr Semenovich

Kovalev Vladimir Aleksandrovich

Dates

2018-01-09Published

2017-04-10Filed