FIELD: oil and gas well building, particularly well cementing.
SUBSTANCE: method involves serially injecting cleaning buffer solution, highly-viscous grouting mortar and cementing grouting mortar. The cleaning buffer solution is solution based on buffer powder taken in amount of 6 m3. The highly-viscous grouting mortar is thickened batch of highly-viscous grouting mortar with 1.92 g/cm3 density taken in amount of 4 m3. Cementing grouting mortar is light-weight grouting mortar of 42 m3 and cement grout taken in amount of 10 m3.
EFFECT: increased efficiency of drilling mud substituting for cement grout, increased quality of formed stone and maintenance of productive formation permeability.
Title | Year | Author | Number |
---|---|---|---|
LIGHTENED CEMENTING SOLUTION, CEMENTING SOLUTION FOR PRODUCTIVE ZONE OF WELL AND METHOD FOR CEMENTING WELLS | 2004 |
|
RU2255204C1 |
CEMENTING METHOD OF WELL | 2020 |
|
RU2728170C1 |
PROCEDURE FOR FIXING WELL WITH CEMENT GROUT | 2009 |
|
RU2398955C1 |
METHOD FOR STRING CEMENTING IN WELL USING CEMENT MORTAR WITH EROSION PROPERTIES | 2009 |
|
RU2398095C1 |
METHOD OF PREPARATION FOR CEMENTING OF WELLS DRILLED USING INVERT-EMULSION DRILLING MUD | 2010 |
|
RU2452849C1 |
CEMENTING METHOD FOR WELL WITH ABNORMALLY LOW RESERVOIR PRESSURE | 2006 |
|
RU2320848C1 |
WELL CEMENTING METHOD UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2021 |
|
RU2775319C1 |
METHOD FOR WELL COMPLETION | 2002 |
|
RU2229585C1 |
PROCESS OF ISOLATION OF ABSORBING AND WATER-SATURATED STRATA | 1990 |
|
RU2057900C1 |
METHOD FOR CEMENTATION OF WELLS | 1996 |
|
RU2123576C1 |
Authors
Dates
2005-12-20—Published
2004-02-16—Filed