FIELD: oil production industry, particularly drilling mud cleaning during oil and gas well drilling.
SUBSTANCE: method for drilling mud cleaning in suction tube provided with pump and mud pit involves installing composite acoustic noise transducer made of quarter-wave resonators in suction tube of mud pump; converting low-frequency noise generated by mud pump in ultrasound; forming ultrasonic standing waves in suction tube over length equal to composite acoustic noise transducer length; applying standing ultrasound wave action in suction pipe on mechanical impurity coagulation and precipitating thereof in mud pit.
EFFECT: increased cleaning efficiency.
5 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CLEANING DRILLING MUD OF PARTICULATE CONTAMINATION INSIDE SUCKING PIPE OF MUD PUMP | 2004 |
|
RU2264524C1 |
METHOD FOR REDUCING INFLUENCE OF MECHANICAL IMPURITIES ON DOWNHOLE EQUIPMENT OPERATION | 2004 |
|
RU2260117C1 |
METHOD OF PARAFFIN ACCUMULATION PREVENTION IN OIL WELL | 2004 |
|
RU2263765C1 |
DEVICE TO PREVENT INGRESS OF MECHANICAL PARTICLES IN ELECTRICALLY DRIVE ROTARY PUMP | 2011 |
|
RU2499128C2 |
METHOD OF THE STEAM PRECIPITATION IN THE WATER-COOLING TOWER | 2005 |
|
RU2295684C1 |
METHOD OF THE OIL STRIPPING IN THE SEPARATOR OF THE FIRST STAGE | 2005 |
|
RU2306169C1 |
METHOD OF REDUCING OF CLOGGING OF PERFORATED APERTURES AND MAIN CRACKS OF POROUS MATRIX IN PRESSURE WELLS WITH SOLIDS OF IMPURITIES | 2006 |
|
RU2341649C2 |
METHOD OF GAS SCRUBBING FROM DROPPING LIQUID IN SEPARATOR | 2007 |
|
RU2354434C1 |
FACILITY FOR DEGASSING OIL-WATER-GAS MIXTURE IN SEPARATOR OF FIRST STAGE (VERSIONS) | 2008 |
|
RU2356597C1 |
METHOD FOR ACOUSTIC BALANCING OF FLOOD FRONT OF OIL BED | 2010 |
|
RU2447273C1 |
Authors
Dates
2006-01-10—Published
2004-05-25—Filed