FIELD: oil and gas production industry, particularly multilateral well construction.
SUBSTANCE: method involves lowering pipe string provided with diverter at end thereof; cutting casing pipe within predetermined interval; lowering flexible pipe with nozzle until flexible pipe enters into opened casing pipe zone under the action of the diverter in alternation with supplying pressurized liquid via flexible pipe provided with nozzle; performing translational flexible pipe movement to create additional well bores having necessary lengths along with removing the flexible pipe to create predetermined number of additional bores. Before casing pipe lowering in the well the casing pipe is provided with acid-soluble insert arranged opposite to formation to be opened. Casing pipe cutting is performed around the full perimeter thereof for necessary length within predetermined opening interval by solving the acid-soluble insert during acid supplying through pipe string into above predetermined interval. After that the diverter having several diverting channel is installed in the interval. After each additional well bore forming flexible string with nozzle is removed only from the pipe string and diverter to create predetermined number of additional bores. After that the flexible pipe with nozzle is finally removed from the casing pipe.
EFFECT: reduced number of trips.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF MULTI-SHAFT WELL | 2007 |
|
RU2333337C1 |
METHOD OF CONSTRUCTION OF MULTI-SHAFT WELL | 2007 |
|
RU2333336C1 |
METHOD OF MULTILATERAL WELL CONSTRUCTION | 2007 |
|
RU2332549C1 |
CLUSTER WELL CONSTRUCTION METHOD | 2004 |
|
RU2265711C1 |
MULTILATERAL WELL BUILDING METHOD | 2004 |
|
RU2269632C1 |
MULTILATERAL WELL BUILDING METHOD | 2004 |
|
RU2269633C1 |
METHOD OF CONSTRUCTION OF MULTI-SHAFT WELL FOR RECOVERY OF HIGH-VISCOSOUS OIL | 2007 |
|
RU2333339C1 |
METHOD FOR CONSTRUCTION OF MULTI-BARREL WELL | 2020 |
|
RU2742087C1 |
METHOD OF CONSTRUCTION OF MULTI-SHAFT WELL FOR RECOVERY OF HIGH-VISCOSOUS OIL | 2007 |
|
RU2333340C1 |
METHOD FOR MULTIHEDRAL WELL CONSTRUCTION | 2006 |
|
RU2318109C1 |
Authors
Dates
2006-01-27—Published
2004-07-16—Filed